Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹598 (0.30%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
18 Aug 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627107776 -EARTHFILLING AND TILES TO THE SCHOOL GROUND AT GOVT MIDDLE SCHOOL KRENCHOO
2026_RDPR_318138_17
e- NIT No. 70/2026-27 Dated 27-07-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹4,000
19 Aug 2026
27 Jul 2026
19 Aug 2026
27 Jul 2026
18 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 100.24 | sqm | 24.12 | ₹2,417.79 |
| 2 | Providing and laying of stone soling incl carriage 10km by MT complete job | 19.78 | cum | 1,100 | ₹21,758 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm N. size | 8.49 | sqm | 5,202.9 | ₹44,172.62 |
| 4 | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard ,jointed with neat cement slurry mixed with pigment to match the shade of the tiles,incl rubbing,cleaning,and curring complete,on 20mm thick bed of cement mortar 1:4 | 125.93 | sqm | 903.85 | ₹1,13,821.83 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size | 0.68 | cum | 5,733.6 | ₹3,898.85 |
| 6 | Banking excavated earth in layers not exceeding 20cm in depth breaking clods,watering rollingeach layer with 1/2tonne roller,or wooden or steel rammer and rolling every 3rd and top most layer with power roller of min 8 tonnes and dressing up,in embankments for roads,flood banks,marginal banks and guide banks etclead upto 50m and lift upto 1.5m in all kinds of soil | 9.34 | cum | 757.38 | ₹7,073.93 |
| 7 | Carriage of sand bajri lead 15 km by MT | 12.46 | cum | 279.04 | ₹3,476.84 |
| 8 | Add cost of sign board,photograps & other unforeseen items | 1 | LS | 3,381 | ₹3,381 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_1046437.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .