Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.6 LAccepted-Finance 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹18.6 L | 1 | Accepted-Finance position 1 |
| 2 | 2₹18.7 LAccepted-Finance | ₹18.7 L | 2 | Accepted-Finance position 2 |
| 3 | 3₹18.9 LAccepted-Finance | ₹18.9 L | 3 | Accepted-Finance position 3 |
| 4 | 4₹19.2 LAccepted-Finance | ₹19.2 L | 4 | Accepted-Finance position 4 |
| 5 | 5₹20.6 LAccepted-Finance | ₹20.6 L | 5 | Accepted-Finance position 5 |
Tender Value
₹24.2 L
EMD Value
₹48,400
Closing Date
22 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA CHIRAWA
CONSTRUCTION AND REPAIR OF CROSS WORK AT VARIOUS PLACES CHIRAWA
2026_DLB_551400_1
NIT NO 01/2026-2027
Open Tender
Civil Works
90 days
CHIRAWA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE OFFICER
₹48,400
Yes
29 Apr 2026
11 Apr 2026
23 Apr 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Lime Concrete, cement concrete grade M-10 (1:5:10) and below | - | Cum | - | - | ITEM 1 |
| 2 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | - | Cum | - | - | ITEM 2 |
| 3 | Carriage of materials by mechanical transport including loading, unloading and stacking :: earth upto 03 km | - | Cum | - | - | ITEM 3 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | - | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | Cum | - | - | - |
| 6 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete. | - | Kg | - | - | ITEM 4 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.72 MB
BOQ_982587.xls
BOQ • 0.24 MB
1.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid