| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89,100Accepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹1.1 L+₹16,632 (18.7%)Rejected-Finance | L2 | Rejected-Finance Higher Bidder | |
| 3 | L3₹1.1 L+₹19,800 (22.2%)Rejected-Finance | L3 | Rejected-Finance Higher Bidder | |
| 4 | L4₹1.1 L+₹21,384 (24.0%)Rejected-Finance | L4 | Rejected-Finance Higher Bidder | |
| 5 | L5₹1.1 L+₹25,304.40 (28.4%)Rejected-Finance | L5 | Rejected-Finance Higher Bidder |
| Sl No | Description | Qty | Unit | KORUNAMOYEE ENTERPRISE L3 | MILLENNIUM AIRCON L5 | MIR ENTERPRISE L1 | M/S KAMALA ELECTRONICS L4 | RAJ KUMAR SINGHA L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Annual Comprehensive maintenance of Air-Conditioning System at Kharagpur SDO Guest House & PWD Inspection Bungalow, kharagpur, Paschim Medinipur. As per detail terms & conditions furnished below :- | ||||||||
| 1.01 | a) 2.0Tr. Split type AC Machine.- 33 Nos.
(Quantity- 33 Nos x 12 Months = 396 Nos) | 396 | Per Unit/ Month | 275 ₹1,08,900 | 288.9 ₹1,14,404.4 | 225 ₹89,100 Lowest | 279 ₹1,10,484 | 267 ₹1,05,732 |
| 1.02Allocation- a) S.D.O Guest House, 2.0Tr. Split type A.C --- 16 Nos b) PWD Bungalow, 2.0 Tr. Split type A.C-- 17 Nos. | ||||||||
| 1.03Objective The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: • To prevent fire hazards arising from RAC installations • To ensure safety of occupants and the general public • To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | ||||||||
| 1.04A. Scope of Work The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split, Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point (Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and replacement of all spare parts and components. A.1 General Requirement 1.1 Spare Parts & Components and activities Covered The contract includes repair/replacement of: • Compressor • Blower motor / fan motor • Condenser & evaporator coils • P.C.B. and Power Supply Card, wherever applicable. • Copper tubing and piping • Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant) • Relays, thermostats, contactors • Remotes • Air filters • Electrical wiring and controls related to A.C. machines • Sheet metal body parts • Nitrile Rubber Insulation of different sizes • Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for outside ducts etc. • Refrigerant gas • Drain Pump All replaced materials must be: • New and OEM approved quality • Approved by Engineer-in-Charge (EIC) prior to installation | ||||||||
| 1.05The agency shall: 1.2 Materials & Consumables Provide all consumables required for maintenance, including: • Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps etc. • Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray • Belts for AHU / ductable blowers, Refrigerant • All Logbooks and/ or Register as mentioned in this document. | ||||||||
| 1.061.3 Tools & Instruments Provide and maintain calibrated tools and instruments, including: • Digital multimeter, Digital Clamp-on ammeter • Insulation resistance tester, Thermal Imaging Scanner • Pressure gauges, Infrared thermometer and Digital Psychrometers • Decibel Meter or SPL (Sound Pressure Level) Meter • Air velocity meter / anemometer • Coil cleaning chemical sprayer • Fin comb for condenser/evaporator fins • Vacuum cleaner / blower for cleaning indoor and outdoor units • High-pressure Water jet pump for condenser coil cleaning • Vacuum pump and Refrigerant charging hose set • Nitrogen cylinder with regulator for pressure testing • Brazing set with gas cylinder • Drain line flushing pump • Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable wrenches, Hackshaw & Hammer, Electric Drill machine. • Insulated ladder • Chain pulley block (for heavy equipment where required)etc. | ||||||||
| 1.071.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ) Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet, Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per direction of EIC. 1.5 Attendance & Monitoring (Applicable only when dedicated manpower is included in BOQ) • Provide biometric attendance system for agency deployed staff if dedicated manpower is considered in BOQ. • Maintain and monitor attendance records • Maintain Registers and logbooks 1.6 Security Ensure watch and ward of all installations | ||||||||
| 1.08A.2 Preventive Maintenance The agency shall carry out the following preventive maintenance activities with minimum frequency indicated against each activity: A.2.1 Monthly Activities • Checking of Grill Temperature and Room Temperature • Measuring Supply Voltage and current drawn by the machine • Checking of Blower and Swing Motor, wherever applicable. • Checking of Thermostat for proper functioning • Cleaning of filters, coils, blowers • Checking refrigerant levels/ pressures and leakage of gas • Checking of all power and signal terminations • Checking wiring between indoor and outdoor units • Cleaning of cooling and condensing coils • Checking condition of Capacitor • Checking of Sound Level • Performance testing • Checking of any unwanted leakage current at the Indoor and outdoor units • Checking the set point of Air-condition machines and if any abnormal temperature setting is noticed, that should be reset and specifically be noted in the log book. | ||||||||
| 1.09A.2.2Half yearly Activities • Tightening electrical connections A.2.3Annual Activities • Thorough overhauling • Painting of sheet metal/ support/ wooden frame of RAC/SRC at site A service report shall be submitted after each above activities, duly signed by the maintenance personnel and countersigned by the Agency/ Supervisor of the agency. Each and every activity and measurement value must also be entered in Log book in detail mentioning machine number, location, date & time. | ||||||||
Tender Value
Refer Docs
EMD Value
₹2,860
Closing Date
22 Aug 2026, 1:00 pmClosed
Executive Engineer Paschim Med. Elecl. Div. PWDte.
Off. of the EE, Pas. Mid. Elec. Divn. PWDte.
Annual Comprehensive maintenance of Air-Conditioning System at Kharagpur SDO Guest House and PWD Inspection Bungalow under Kharagpur Electrical Sub-Division, P.W.Dte.
2026_WBPWD_5018392_1
WBPWD/EE/PMED/NIQ-43/e-Q /2026-2027
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Kharagpur, Paschim Medinipur.
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,860
Off. of the EE, Pas. Mid. Elec. Divn. PWDte.
29 Sept 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
22 Aug 2026
18 Aug 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annual Comprehensive maintenance of Air-Conditioning System at Kharagpur SDO Guest House & PWD Inspection Bungalow, kharagpur, Paschim Medinipur. As per detail terms & conditions furnished below :- | |||||
| 1.01 | a) 2.0Tr. Split type AC Machine.- 33 Nos.
(Quantity- 33 Nos x 12 Months = 396 Nos) | - | Per Unit/ Month | 2.25 | - |
| 1.02 | Allocation-
a) S.D.O Guest House, 2.0Tr. Split type A.C --- 16 Nos
b) PWD Bungalow, 2.0 Tr. Split type A.C-- 17 Nos. | - | - | - | - |
| 1.03 | Objective
The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is:
• To prevent fire hazards arising from RAC installations
• To ensure safety of occupants and the general public
• To minimize breakdowns and associated downtime and to ensure performance at desired efficiency.
Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | - | - | - | - |
| 1.04 | A. Scope of Work
The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split, Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point (Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and replacement of all spare parts and components.
A.1 General Requirement
1.1 Spare Parts & Components and activities Covered
The contract includes repair/replacement of:
• Compressor
• Blower motor / fan motor
• Condenser & evaporator coils
• P.C.B. and Power Supply Card, wherever applicable.
• Copper tubing and piping
• Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant)
• Relays, thermostats, contactors
• Remotes
• Air filters
• Electrical wiring and controls related to A.C. machines
• Sheet metal body parts
• Nitrile Rubber Insulation of different sizes
• Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for outside ducts etc.
• Refrigerant gas
• Drain Pump
All replaced materials must be:
• New and OEM approved quality
• Approved by Engineer-in-Charge (EIC) prior to installation | - | - | - | - |
| 1.05 | The agency shall:
1.2 Materials & Consumables
Provide all consumables required for maintenance, including:
• Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps
etc.
• Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray
• Belts for AHU / ductable blowers, Refrigerant
• All Logbooks and/ or Register as mentioned in this document. | - | - | - | - |
| 1.06 | 1.3 Tools & Instruments
Provide and maintain calibrated tools and instruments, including:
• Digital multimeter, Digital Clamp-on ammeter
• Insulation resistance tester, Thermal Imaging Scanner
• Pressure gauges, Infrared thermometer and Digital Psychrometers
• Decibel Meter or SPL (Sound Pressure Level) Meter
• Air velocity meter / anemometer
• Coil cleaning chemical sprayer
• Fin comb for condenser/evaporator fins
• Vacuum cleaner / blower for cleaning indoor and outdoor units
• High-pressure Water jet pump for condenser coil cleaning
• Vacuum pump and Refrigerant charging hose set
• Nitrogen cylinder with regulator for pressure testing
• Brazing set with gas cylinder
• Drain line flushing pump
• Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable wrenches, Hackshaw & Hammer, Electric Drill machine.
• Insulated ladder
• Chain pulley block (for heavy equipment where required)etc. | - | - | - | - |
| 1.07 | 1.4 Uniform and Safety Gear (Applicable only when dedicated manpower is included in BOQ)
Ensure all staff use proper uniforms. Provide at least two sets of uniforms and safety gear (helmet, Umbrella, raincoat, gumboots, etc.) to each staff member. The color end embossing should be as per direction of EIC.
1.5 Attendance & Monitoring (Applicable only when dedicated manpower is included in BOQ)
• Provide biometric attendance system for agency deployed staff if dedicated manpower is
considered in BOQ.
• Maintain and monitor attendance records
• Maintain Registers and logbooks
1.6 Security
Ensure watch and ward of all installations | - | - | - | - |
| 1.08 | A.2 Preventive Maintenance
The agency shall carry out the following preventive maintenance activities with minimum frequency indicated against each activity:
A.2.1 Monthly Activities
• Checking of Grill Temperature and Room Temperature
• Measuring Supply Voltage and current drawn by the machine
• Checking of Blower and Swing Motor, wherever applicable.
• Checking of Thermostat for proper functioning
• Cleaning of filters, coils, blowers
• Checking refrigerant levels/ pressures and leakage of gas
• Checking of all power and signal terminations
• Checking wiring between indoor and outdoor units
• Cleaning of cooling and condensing coils
• Checking condition of Capacitor
• Checking of Sound Level
• Performance testing
• Checking of any unwanted leakage current at the Indoor and outdoor units
• Checking the set point of Air-condition machines and if any abnormal temperature setting is noticed, that should be reset and specifically be noted in the log book. | - | - | - | - |
| 1.09 | A.2.2Half yearly Activities
• Tightening electrical connections
A.2.3Annual Activities
• Thorough overhauling
• Painting of sheet metal/ support/ wooden frame of RAC/SRC at site
A service report shall be submitted after each above activities, duly signed by the maintenance personnel and countersigned by the Agency/ Supervisor of the agency. Each and every activity and measurement value must also be entered in Log book in detail mentioning machine number, location, date & time. | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_5089370.xls
BOQ • 0.38 MB
2911_.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .