Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.3 CrAdmitted-Finance BALAJI NAGAR UBASI BALAJI NAGAR UBASI JAYAL NAGAUR BALAJI NAGAR NAGAUR RAJASTHAN 341030 | NAGAUR | RAJASTHAN | 341030 | ₹21.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹22.5 Cr+₹1.2 Cr (5.84%)Admitted-Finance SHOP NO 102 PHASE 3 NEAR GATE NO 3 NEW AUTO MARKET HISAR 125001 HARYANA | HISAR | HISAR | HARYANA | 125001 | ₹22.5 Cr+₹1.2 Cr (5.84%) | L2 | Admitted-Finance |
| 3 | L3₹23.6 Cr+₹2.4 Cr (11.2%)Admitted-Finance | ₹23.6 Cr+₹2.4 Cr (11.2%) | L3 | Admitted-Finance |
| 4 | L4₹24.2 Cr+₹3.0 Cr (14.1%)Admitted-Finance P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹24.2 Cr+₹3.0 Cr (14.1%) | L4 | Admitted-Finance |
| 5 | L5₹29.0 Cr+₹7.7 Cr (36.3%)Admitted-Finance A 89 TUIKUAL SOUTH TEMPLE SQUARE T 31 LALDENGA ROAD TUIKHUAHTLANG AIZAWL MIZORAM | AIZAWL | MIZORAM | 791701 | ₹29.0 Cr+₹7.7 Cr (36.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SLT Infracon Pvt. Ltd. L4 | Nidhi Creative Infrastructure (P) Ltd. L3 | SHRI BALAJI CONSTRUCTION COMPANY L1 | F.LALMALSAWMA L5 | KMR BUILDCON PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Date: *** | ||||||||
| 2.00To, The Chief Engineer, PWD, Highway, Tuikhuahtlang, Aizawl-796001, Mizoram. | ||||||||
| 3.00Sub: Construction of Khankawn to Rongura Hmun in Serchhip District (Length = 11.60 km), Mizoram under NESIDS (Roads) on EPC mode. | ||||||||
| 4.00Dear Sir, With reference to your RFP document dated 05.05.2025, I/we, having examined the Bidding Documents and understood their contents, hereby submit my/our BID for the aforesaid Project. The BID is unconditional and unqualified. 2. I/ We acknowledge that the Authority will be relying on the information provided in the BID and the documents accompanying the BID for selection of the Contractor for the aforesaid Project, and we certify that all information provided in the Bid are true and correct; nothing has been omitted which renders such information misleading; and all documents accompanying the BID are true copies of their respective originals. 3. The BID Price has been quoted by me/us after taking into consideration all the terms and conditions stated in the RFP, draft Agreement, our own estimates of costs and after a careful assessment of the site and all own the conditions that may affect the project cost and implementation of the project. 4. I/ We acknowledge the right of the Authority to reject our BID without assigning any reason or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever. | ||||||||
| 5.005. In the event of my/ our being declared as the Selected Bidder, I/we agree to enter into a Agreement in accordance with the draft that has been provided to me/us prior to the BID Due Date. We agree not to seek any changes in the aforesaid draft and agree to abide by the same. 6. I/ We shall keep this offer valid for 120 (one hundred and twenty) days from the BID Due Date specified in the RFP. | ||||||||
| 6.00 | 7. I/ We hereby submit our BID and offer a BID Price Rs. | 10 | Nos | 24,24,00,000 ₹24,24,00,000 | 23,62,50,000 ₹23,62,50,000 | 21,25,00,000 ₹21,25,00,000 Lowest | 28,96,21,584 ₹28,96,21,584 | 22,49,00,000 ₹22,49,00,000 |
| 7.00for undertaking the aforesaid Project in accordance with the Bidding Documents and the Agreement. | ||||||||
Tender Value
Refer Docs
EMD Value
₹30.5 L
Closing Date
26 May 2025, 12:00 pmClosed
Chief Engineer, PWD, Highway, Mizoram Aizawl
Chief Engineer, PWD, Highway Office, Mizoram
Construction of Khankawn to Rongura Hmun in Serchhip District Length 11/60 km, Mizoram under NESIDS Roads
2025_PWD_465_1
2/RFP/EPC/CE-HW/2025-26 Dt. 05.05.2025
Open Tender
Civil Works – Roads
Lump-sum
548 days
Khankawn to Rongura Hmun in Serchhip Distrit
As per tender documents
4 documents required · 4 mandatory
₹10,000
Chief Engineer, PWD, Highway, Aizawl, Mizoram
₹30.5 L
Chief Engineer, PWD, Highway Office, Mizoram
25 Jul 2025
5 May 2025
27 May 2025
5 May 2025
26 May 2025
20 May 2025
5 May 2025 - 15 May 2025
15 May 2025
Amount
To, The Chief Engineer, PWD, Highway, Tuikhuahtlang, Aizawl-796001, Mizoram.
Sub: Construction of Khankawn to Rongura Hmun in Serchhip District (Length = 11.60 km), Mizoram under NESIDS (Roads) on EPC mode.
7. I/ We hereby submit our BID and offer a BID Price Rs.
for undertaking the aforesaid Project in accordance with the Bidding Documents and the Agreement.
KMR BUILDCON PRIVATE LIMITED (BID ID -1306)
Nidhi Creative Infrastructure (P) Ltd. (BID ID -1311)
SLT Infracon Pvt. Ltd. (BID ID -1313)
F.LALMALSAWMA (BID ID -1303)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .