Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-Finance 571 06 HIND NAGAR LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹31.3 L | L1 | Accepted-Finance LOWER RATE FOUND |
| 2 | L2₹31.4 L+₹2,684.38 (0.09%)Rejected-Finance SARAY SHAHJADI JUNABGANJ BANTHARA BANTHARA BANTHARA LUCKNOW UTTAR PRADESH 226002 | LUCKNOW | UTTAR PRADESH | 226002 | ₹31.4 L+₹2,684.38 (0.09%) | L2 | Rejected-Finance HIGHER RATE FOUND |
| 3 | L3₹31.4 L+₹4,026.56 (0.13%)Rejected-Finance | ₹31.4 L+₹4,026.56 (0.13%) | L3 | Rejected-Finance HIGHER RATE FOUND |
Tender Value
₹26.6 L
EMD Value
₹2.7 L
Closing Date
9 Mar 2026, 2:00 pmClosed
EO
NPP SLN
AS PER BOQ
2026_DOLBU_1119674_1
869/NPPSLN/25-26
Open Tender
Civil Works - Others
Fixed-rate
90 days
SADAR
AS PER NIT
2 documents required · 2 mandatory
₹3,068
Yes
EO
₹2.7 L
Yes
20 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation by mchanical means(Hydraulic excavator)/manual means over area (exceeding 30 cm in depth,1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer -in-charge.All kind of soil .SOR2.6.1 | 73.03 | Cum | 125 | ₹9,128.75 |
| 2 | Excavation,supplying ,stacking and filling of local earth (including royalty)
by mechanical transport upto a lead of 5km also including ramming and watering of earth in layers not exceeding 20 cm in foundation trench ,plinth,sides of foundation etc. complete for all lift. as per analysis | 189 | cum | 264.25 | ₹49,943.25 |
| 3 | Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete.SOR2.27 | 45.7 | Cum | 840 | ₹38,388 |
| 4 | Providing and laying of position cement conc. Of specified grade excluding thre cost of centering and shuttering with 1:4:8(1 cement :4 c.sand :8 graded stone aggregate 40mm nominal size derived from natural source) SOR 4.1.8 | 27 | Cum | 5,990 | ₹1,61,730 |
| 5 | Providing and laying in position: cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level:1:6:12 (1 cement: 6 coarse sand (zone-III): 12 graded Brick aggregate 40 mm (nominal size) SOR 273 | 1.91 | Cum | 4,500 | ₹8,595 |
| 6 | Centering and shuttering including sturtting,propping etc and removal of form work for | 26.4 | Sqm. | 170 | ₹4,488 |
| 6.01 | CH-1 | 106.5 | Sqm. | 305 | ₹32,482.5 |
| 6.02 | CH-2 | 49.5 | Sqm. | 385 | ₹19,057.5 |
| 7 | Providing and laying of R.C.C with 1:1.5:3, (1 cement:1.5 c.sand(zone III)
Derived from natural source :3 graded stone aggregate 20 mm nominal size derived from natural source SOR5.1.2 | 27.9 | Cum | 8,120 | ₹2,26,548 |
| 8 | Providing and laying of R.C.C with 1:1.5:3,(1 cement:1.5 c.sand(zone III)
Derived from natural source :3 graded stone aggregate 20 mm nominal size derived from natural source SOR5.2.2 | 9.5 | Cum | 8,797 | ₹83,571.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_2082223.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .