Loading…
Loading…
Tender Value
₹16.8 Cr
EMD Value
₹33.5 L
Closing Date
12 Aug 2026, 5:00 pm3d left
BHANU PARKASH SHARMA
Jind PHED No. 1
Various size of sewer line and construction of 1 No. 10 MLD STP
2026_HRY_537029_1
20265DF45B0A AA86 43DE 824F FD77E1F54BBF568PUH
Open Tender
Civil Works
Works
575 days
Jind
4 documents required · 4 mandatory
₹20,000
₹33.5 L
Yes
28 Jul 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
12 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Installing 6 CCTV Cameras 4 Cameras for STP and 2 Cameras for MPS)complete as per satisfaction of the Engineer-in-Charge, within 96 hours of signing the Agreement along with 90days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sitesie. MPS and STP shall be synchronized at STP site. | 1 | - | - | - |
| 2 | Construction of HT/LT Panel room, PLC room, centrifuge house blower room and Lab cum office building including doors, window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitirified glaze tiles flooring powder coated aluminum frame of size 100 mm 45 mm of 10 gauge for chowkhat framed, 75mm x 45 mm of 10 gauge for door frame, 45 mm x 45mm of 10 gauge for window frame, 5mm thick grass AIS/Saint Gobin/ Modi Float, covered area 400 sqm Operation and Maintenance of 5 years after 12 months defect liability period after 3 months trial run period complete in all respects as per approve DNIT. | 400 | - | - | - |
| 3 | : SEWAGE TREATMENT PLANT OF 10.00 MLD. Design construction, erection, testing and commissioning of 10.00 MLD STP based on Sequential Batch Reactor technology complete in all respects including suitable Equalization tank, Equalization Pump House, Flash mixing tank, Flocculation Basins, Tube settler, SBR Basins, Fibre Disc Filter, Chlorination cum Chlorine Tonner House, Chlorine Contact Tank, RCC pipe Gravity main for disposal of treated effluent upto existing effluent channel , Primary sludge sump, Sludge Pump house, Belt Filter Press and Belt filter house, Centrifuge Feed Sump, Centrifuge House, SBR Air blower cum Administration cum Control building, DWPE Dosing tank for Belt Press, DWPE Dosing tank for centrifuge, NAOH Dosing Tank, PAC Dosing tank, Fecl3 Dosing Tank, Centrate Sump, Landscaping, and all other works contingent Electrical, Mechanical and Piping instrumentation works with PLC SCADA arrangement for STP and Equalization tank along with synchronizing it with each other including all mechanical and Electrical equipment / Machinery required, Diesel Generating Set of designed capacity and Transformer, Electromagnetic flow measurement device on Inlet and Outlet real time water quality monitoring with Data collection system (Analyzer) with PLC SCADA including Furniture and Laboratory equipment as per detail annexed in the Bid Document i) Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building of 200 Sqm covered area including doors window and fitting with toilet block including sanitary fittings etc. as per drawing attached in DNIT at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat frame, 75mm x 45mm of 10 gauge for door frame , 45mm x 45mm of 10 gauge for window frame, 5mm thick glass AIS / Saint Gobin/ Modi Float, covered area 200 sqm i) CCTV CAMERA: Providing and installing 6 CCTV Cameras - 4 Cameras for STP and 2 Camera for MPS complete as per satisfaction of the Engineer - in - charge along with 90 days recording (DVR), 32 inch LED Screen, 16 Channel DVR at STP site and 8 Channel DVR at MPS site with connectors cables, poles and power supply with online real time output facility. The cameras at both the sites i.e MPS and STP shall be synchronized at STP site. At STP and MPS Site 1 No. PTZ speed dome 360 degree 50x zoom camera 3 no. 12mm lens size 1 no. 36mm size Make - CP Plus Internet protocol minimum 5 MP WDR, Night vision colour mode 2.4.2 12mm very focal with extra IR CCTV Cameras should be installed and commissioned before starting execution of work including operation and Maintenance of 5 years after 12 months defect liability period and 3 months trail run period. iii) (2 No. High Mast of 3 mtr GI Octagonal Poe 4mm thickness (T=100mm, Base Plate - 320 x320 x 20mm ), Window at 500mm from Base Plate with 6 no. LED energyoutdoor suitable size reputed make efficient lamps on each pole, including 20no. LED outdoor lights with GI poles 12.50 Mtr high including all accessoriesalong the road and path complete in all respect. | 1 | - | - | - |
| 4 | Construction of MPS for 10.00 MLD STP at Jind , Design, construction, erection, testing and commissioning of MPS and following components: a) RCC Inlet chamber, screening chamber, collecting tank, wet well sump suitable for 10.00 MLD average flow with peak factor 2.25 including Providing and installing 5 No. i.e 1 No. 15625 LPM x 20.00 m head, 2 No.7000 LPM x 20m head , 2 No. 3500 LPM x 20 m head non clog sewage submersible pump sets equipped with VFD and suitable LT panel boards, all safety devices, automatic capacitor bank and suitable size submersible cable from LT panel to pumps complete in all respect as per satisfaction of the Engineer in charge. b) K9 DI pipe of suitable dia at MPS including welding and screwing of flanges, ISI marked D.I. fittings, Knife gate valves, non return valves as per requirements even for bye-pass arrangements along with necessary Knife gate valves etc. complete in all respect. c) 5 Nos. CI Gear Operated motorized Sluice Gate thimble face wall mounted as per IS 13349 with SS Spindle (SS 304) and seats (SS 304) (2 Nos. for screens at Upstream and Downstream, 2 Nos. at Distribution chamber and 1 no. for partition of collecting tank) as per design. d) Supply and installation of 3 Nos. mechanical coarse screens (2W plus 1S) suitable for for 10 MLD average flow with peak factor of 2.25 complete in all respect along with screw conveyor. e) Entire infrastructure f) all pipe as per site requirement g) All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility. h) Raw sewage will be available near boundary wall within the premises of proposed STP but the conveyance of sewage through RCC pipe NP-3 from this terminal point to the receiving Chamber of the MPS is included in the Turnkey contract. i) The size and quantities of all the above components will be as per approved structural/ Hydraulic / Mechanical/ Electrical design to be approved by Departmental before actual execution of work. with all safety devices, automatic capacitor bank and submersible cable complete in all respects as per satisfaction of the Engineer in charge. | 1 | - | - | - |
| 5 | 問呎†椊੮獒††倠1ǣ伀数慲楴湯愠摮洠楡瑮湥湡散漠桴潣灭敬整猠潣数漠眠牯敲畱物摥琠敢攠數畣整湩琠楨乄呉椠攮ㄠ⸰〰†䱍⁄呓ⱐ䴠卐汆睯洠瑥獲湡污穹牥湩汣摵湩慭灮睯牥污档浥捩污档潬楲敮瀠汯浹牥攠捴愠摮愠汬†汥捥牴捩污敭档湡捩污潨瑲捩汵畴敲愠摮挠癩汩猠牴捵畴敲猠†潦″潭瑮獨猠捵散獳畦牴楡畲数楲摯湯敹牡搠晥捥⁴氠慩楢楬祴瀠牥潩湡楦敶礠慥桴牥慥瑦牥漠桴挠浯業獳潩楮杮漠捳敨敭愠摮瀠慬瑮⠠潣瑳漠桴⁏湡䴠眠汩敢欠灥⁴業楮畭〲‥景攠瑳浩瑡摥挠獯⁴景†潷歲⸩䨀扯匀浱䌀浯汰瑥潊ᕢ佔䅔⁌䵁問呎䤠潗摲ࡳࠀ啎䉍剅⌠1Ĉ吀塅⁔ԣԀࠀ䕔员У | 1 | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_616173.xls
BOQ • 0.32 MB
0G23ULZ171356.pdf
Additional Documents • 3.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].