| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹22.2 LAdmitted-Finance | -23.01% | ₹22.2 L | L1 | Admitted-Finance |
| 2 | L2₹22.7 LAdmitted-Finance | -21.20% | ₹22.7 L | L2 | Admitted-Finance |
| 3 | L3₹27.0 LAdmitted-Finance | -6.21% | ₹27.0 L | L3 | Admitted-Finance |
| 4 | L4₹28.3 LAdmitted-Finance | -1.65% | ₹28.3 L | L4 | Admitted-Finance |
| 5 | L5₹28.6 LAdmitted-Finance | -0.50% | ₹28.6 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹28.8 L
EMD Value
₹86,340
Closing Date
21 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION KATHUA
pmgsy division kathua
Permanent Restoration T01 to Odd
2026_JKRRD_147248_14
EE/PMGSY/KUA03of2026-27 DATED10.04.2026
Open Tender
CIVIL
60 days
Permanent Restoration T01 to Odd
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PMGSY DIVBISION KATHUA
₹86,340
pmgsy division kathua
6 May 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation for structures. Earthwork in Excavation for structures in all kind of soil, soft rock,
hard rock as per drawing and technical specification clause 305.1 including setting out,
Construction of shoring and bracing removal of stumps and other deleterious material and
disposal upto lead of 50m, dressing of sides and bottom and backfilling in trenches with
excavated suitable material upto 3m depth. | 653.24 | cum | 256.85 | ₹1,67,784.69 | BI01010001010000000000000515BI0100001119 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with Providing and
laying in position cement concrete of specified grade including curing but excluding the cost of
centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8
graded stone aggregate 40 mm nominal size | 12 | cum | 5,660.38 | ₹67,924.56 | BI01010001010000000000000515BI0100001120 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2
coarse sand : 4 graded stone aggregate 20 mm nominal size) | 39 | cum | 7,103.38 | ₹2,77,031.82 | BI01010001010000000000000515BI0100001121 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete incl curing but
excluding the cost of centering , shuttering, finishing and reinforcement all work upto plinth
level 1:1.5:3 ( 1 cement :1.5 coarse sand :3 graded stone agg. 20 mm nominal size) | 1.8 | CUM | 8,329.67 | ₹14,993.41 | BI01010001010000000000000515BI0100001122 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D
or more. | 216 | KG | 125.36 | ₹27,077.76 | BI01010001010000000000000515BI0100001123 |
| 6 | Providing and laying of boulder apron laid in wire crates with 4mm dia GI wire
conforming to IS:280 and IS:4826 in 100mm x 100 mm mesh ( woven diagonally) including 10 percent
extra for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing & | 570.24 | cum | - | - | BI01010001010000000000000515BI0100001124 |
| 7 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a
lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in
trenches, plinth, sides of foundation etc. complete | 64.8 | cum | - | - | BI01010001010000000000000515BI0100001125 |
| 8 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075
mm ) to wet mix macadam (WMM) specification including premixing the material with water at
OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base course on well
prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the
desired density, complete as per specifications and directions of Engineer-in-Charge | - | cum | - | - | BI01010001010000000000000515BI0100001126 |
| 9 | Tack Coat
Providing and applying tack coat using hot straight run bitumen of grade – VG-30, including
heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on
bitumen boiler, cleaning and preparing the existing road surface as per specifications.On
bitumen surface @ 0.50 Kg/sqm | - | sqm | - | - | BI01010001010000000000000515BI0100001127 |
| 10 | 2 cm premix carpet surfacing with 1.8cum and 0.90 cum of stone chippings of 13.2 mm size and
11.2 size respectively, per 100 sqm and 52kg and 56 kg of hot bitumen per cum of stone
chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run
bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack
coat to be paid for separately).With paving Asphalt grade VG-30 with no solvent | - | sqm | - | - | BI01010001010000000000000515BI0100001128 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_229393.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid