Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.1 Cr+₹12.7 L (1.80%)Accepted-Finance | L2 | Accepted-Finance L2 |
| Sl No | Description | Qty | Unit | M/s Eastern Construction L2 | M/S BSL ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Sub-Head(I) :- SITE DEVELOPMENT | |||||
| 2.00 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift upto 1.50 m. | 5,253.13 | Cum | 300 ₹15,75,939 | 265 ₹13,92,079.45 Lowest |
| 3.00Sub-Head(II) :- RCC STRUCTURE (G+2) HOSTEL BUILDING | |||||
| 4.00 | Clearing Grass and Removal of Rubbish | 0.24 | ha | 33,000 ₹7,920 | 31,931.25 ₹7,663.5 Lowest |
| 5.00 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 262.8 | Cum | 380 ₹99,864 | 344.18 ₹90,450.5 Lowest |
| 6.00Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding. | |||||
| 7.00 | A) Rubble stone laid in cement mortar 1:3 | 127.89 | Cum | 9,000 ₹11,51,010 | 8,910 ₹11,39,499.9 Lowest |
| 8.00 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete | 95.14 | Cum | 200 ₹19,028 | 185 ₹17,600.9 Lowest |
| 9.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 176.74 | Cum | 1,000 ₹1,76,740 | 985 ₹1,74,088.9 Lowest |
| 10.00 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 32 | Cum | 6,000 ₹1,92,000 | 5,789.84 ₹1,85,274.88 Lowest |
Tender Value
₹7.2 Cr
EMD Value
₹7.2 L
Closing Date
23 Jul 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Pai Dawe
Executive Engineer WR Division Bomdila West Kameng District AP
Construction of Working Women hostel at Bomdila west Kameng District
2025_APWRD_2637_1
WRD/BDL/NIT/2025-26/08
Open Tender
Civil Works
Item Rate
Bomdila
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE WR Division Bomdila
₹7.2 L
19/07/2025
25 Dec 2025
17 Jul 2025
24 Jul 2025
17 Jul 2025
23 Jul 2025
17 Jul 2025
19 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Sub-Head(I) :- SITE DEVELOPMENT | - | - | - | - |
| 2 | Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift upto 1.50 m. | 5,253.13 | Cum | 100 | ₹5,25,313 |
| 3 | Sub-Head(II) :- RCC STRUCTURE (G+2) HOSTEL BUILDING | - | - | - | - |
| 4 | Clearing Grass and Removal of Rubbish | 0.24 | ha | 100 | ₹24 |
| 5 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 262.8 | Cum | 100 | ₹26,280 |
| 6 | Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concrete bedding. | - | - | - | - |
| 7 | A) Rubble stone laid in cement mortar 1:3 | 127.89 | Cum | 100 | ₹12,789 |
| 8 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete | 95.14 | Cum | 100 | ₹9,514 |
| 9 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 176.74 | Cum | 100 | ₹17,674 |
| 10 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 32 | Cum | 100 | ₹3,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2825.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_2825.xls
BOQ • 0.43 MB
175967329.pdf
Tender Documents • 0.62 MB
175967348.html
Tender Documents • 0.05 MB
SBD_Bomdila.pdf
Tender Documents • 13.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .