Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.6 L+₹70,987.15 (12.0%)Admitted-Finance | ₹6.6 L+₹70,987.15 (12.0%) | L2 | Admitted-Finance |
| 3 | L3₹6.6 L+₹74,852.30 (12.7%)Admitted-Finance | ₹6.6 L+₹74,852.30 (12.7%) | L3 | Admitted-Finance |
| 4 | L4₹7.2 L+₹1.3 L (22.8%)Admitted-Finance | ₹7.2 L+₹1.3 L (22.8%) | L4 | Admitted-Finance |
| 5 | L5₹8.1 L+₹2.2 L (36.5%)Admitted-Finance | ₹8.1 L+₹2.2 L (36.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JYOTSONS CONSTRUCTION L5 | SAMIA CONSTRUCTION L2 | MANTU KUMAR PATHAK L3 | NABAJIT DEKA L4 | Arjun Malo L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within the campus as directed by Engineer in Charge. | 137.94 | Sqm | 150 ₹20,691 | 100 ₹13,794 | 120 ₹16,552.8 | 145 ₹20,001.3 | 50 ₹6,897 Lowest |
| 2.00Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | ||||||||
| 2.10 | (a) In cement mortar | 2.45 | Cum | 2,000 ₹4,900 | 1,000 ₹2,450 Lowest | 1,700 ₹4,165 | 1,700 ₹4,165 | 1,000 ₹2,450 Lowest |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||||||
| 3.10 | (b) 1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.86 | Cum | 6,200 ₹5,332 | 7,000 ₹6,020 | 6,000 ₹5,160 | 5,200 ₹4,472 Lowest | 6,000 ₹5,160 |
| 3.20 | (b) 1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.85 | Cum | 6,200 ₹23,870 | 7,000 ₹26,950 | 6,000 ₹23,100 | 5,200 ₹20,020 Lowest | 6,000 ₹23,100 |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for | ||||||||
| 4.10 | (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 18.3 | sqm | 700 ₹12,810 | 300 ₹5,490 Lowest | 600 ₹10,980 | 600 ₹10,980 | 300 ₹5,490 Lowest |
| 5.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | ||||||||
| 5.10 | (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.75 | cum | 8,500 ₹14,875 | 7,500 ₹13,125 | 7,000 ₹12,250 Lowest | 7,200 ₹12,600 | 7,000 ₹12,250 Lowest |
Tender Value
₹8.9 L
EMD Value
₹18,000
Closing Date
15 Jun 2026, 10:00 amClosed
HOS MAINTENANCE
IPM SECTION IIT GUWAHATI
Repair of renovation of dormitory room for mess worker at Barak Hostel in IITG Campus
2026_IITG_911314_1
IITG/IPM/NIT/R/2026-27/10
Open Tender
Civil Works
Works
120 days
IIT GUWAHATI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Registrar, IIT Guwahati
₹18,000
6 Aug 2026
3 Jun 2026
16 Jun 2026
3 Jun 2026
15 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within the campus as directed by Engineer in Charge. | 137.94 | Sqm | - | - |
| 2Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | |||||
| 2.1 | (a) In cement mortar | 2.45 | Cum | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.1 | (b) 1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.86 | Cum | - | - |
| 3.2 | (b) 1:5:10 (1 cement : 5 coarse sand (zone-ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.85 | Cum | - | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.1 | (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers | 18.3 | sqm | - | - |
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 5.1 | (a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.75 | cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_957750.xls
BOQ • 0.42 MB
NIT.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .