Construction of Nala Covering work at Maharana Pratap Gate To Shyama Prasad Mukharjee gate in ward no 6
2026_UAD_513495_2
Zone2/2026/ward6/nalacovering
Open Tender
Civil Works - Others
Percentage
60 days
at Maharana Pratap Gate To Shyama Prasad Mukharjee
Please refer tender document
4 documents required · 4 mandatory
₹5,000
₹23,640
21 Jul 2026
21 Jul 2026
7 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge. 1:3:6 or richer mix | 50 | cum | 534 | ₹26,700 |
| 2 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable
material within 50 meters lead as per direction of Engineer-in- In cement mortar | 20 | cum | 437 | ₹8,740 |
| 3 | Brick work will well burnt open bhatta bricks crushing strength not less than
25kg/cm² and water absoption not more than 20% in foundation and plinth
In cm 1:6. | 100 | cum | 3,868 | ₹3,86,800 |
| 4 | 18mmcementplasterintwocoatsunderlayer12mmthickcement
plaster1:5(1cement:5coarsesand)finishedwithatoplayer6mm
thick cement plaster 1:4 (1 cement: 4 fine sand). | 400 | sqm | 159 | ₹63,600 |
| 5 | Providing and laying in position specified grade reinforced cement convrete excluding the cost of centering and shuttering, finishing and reinforcement - All work up to plinth level. Cement concrete grade M-20 (Nominal Mix) with 20 mm maximum size of stone aggregate | 200 | cum | 5,435 | ₹10,87,000 |
| 6 | Centering and shuttering including strutting, propping etc.and removal of form for : Foundations, footings, bases of columns, etc. For mass concrete. | 340 | sqm | 289 | ₹98,260 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated Bars | 15,700 | kg | 58 | ₹9,10,600 |
| 8 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints finished flush. (minimum size of kota stone 0.25 sqm) Red sand stone | 900 | sqm | 541 | ₹4,86,900 |
| 9 | Structural steel work riveted, bolted or welded in built up
sections, trusses and framed work, including cutting, hoisting, fixing
in position and applying a priming coat of approved steel primer all
complete: | 1,200 | kg | 69 | ₹82,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
tenderdocument.pdf
Tender Documents • 0.64 MB
BOQ_629554.xls
BOQ • 0.30 MB
NIT.pdf
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].