Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.6 LAccepted-AOC VILLAGE BARHA POST SISWA TEHSIL PADRAUNA DISTRICT KUSHINAGAR UTTAR PRADESH | KUSHINAGAR | UTTAR PRADESH | ₹21.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹23.1 LRejected-Finance ARRA BIHAR | NALANDA | BIHAR | 801301 | ₹23.1 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹23.6 LRejected-Finance | ₹23.6 L | L3 | Rejected-Finance Rejected |
| 4 | L4₹27.6 LRejected-Finance | ₹27.6 L | L4 | Rejected-Finance Rejected |
Tender Value
₹30 L
EMD Value
₹3 L
Closing Date
25 Apr 2026, 12:00 pmClosed
Office of the E E CD PWD Deoria
Office of the E E CD PWD Deoria
Repair work at the Sub Registrars Office Deoria Sadar in District Deoria
2026_CEGKP_1137727_1
1277/5A Date 07-04-2026
Open Tender
Civil Works - Buildings
90 days
DEORIA
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹3 L
Office of the E E CD PWD Deoria
8 Jun 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
25 Apr 2026
17 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. DSR 15.7.4 In cement mortar | - | cum | - | - | |
Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.D.S.R. 2.8 | - | cum | - | - | |
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.8 | - | cum | - | - | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in D.S.R. 6.1.2 | - | cum | - | - | |
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in: 6.4.2 Cement mortar 1 :6 ( 1 cement : 6 coarse sand) | - | cum | - | - | |
Providing and laying in position specified grade(1 :1.5:3) of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : D.S.R 5.1.2 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : - All work up to plinth level : D.S.R 5.2.2 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chanas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1: 1.5:3 DSR 5.3 | - | cum | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-5000 | - | kg | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for D.S.R 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_2125247.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid