Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.2 L
EMD Value
₹20,300
Closing Date
4 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
THE STAFF OFFICER CIVIL BHATGAON AREA
OFFICE OF THE STAFF OFFICER CIVIL BHATGAON AREA
Providing protection wall against illegal rat holes mining and repairing boundary wall in different places at Dugga OCM under Dugga Sub Area of Bhatgaon Area
2026_SECL_369313_1
GM/BHAT/CVL/e-Tender/26-27/60 DATE 21/11/2026
Open Tender
Civil Works - Others
Percentage
365 days
SECL, BHATGAON AREA
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,300
23 Nov 2026
23 Nov 2026
7 Dec 2026
23 Nov 2026
4 Dec 2026
24 Nov 2026
23 Nov 2026 - 27 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 31.32 | cum | 127.7 | ₹3,999.18 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 51.25 | cum | 6,692.4 | ₹3,42,958.73 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars | 2,049.84 | kg | 90.45 | ₹1,85,408.03 |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) | 162.1 | cum | 4,875.3 | ₹7,90,266.63 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 170.82 | sqm | 280.8 | ₹47,966.26 |
| 6 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 0.29 MB
Tendernotice_3.pdf
PDF • 1.79 MB
BOQ_382354.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .