Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance FLAT NO S 2 SHRI CHINTAMANI S NO 1 1148 MAHAJAN PETH MODEL COLONY SHIVAJI NAGAR PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | L1 | Accepted-Finance Bidder Quoted L1 rates | |
| 2 | L2₹1.2 Cr+₹5.8 L (5.02%)Rejected-Finance | L2 | Rejected-Finance Bidder not Quoted L1 rates | |
| 3 | Rejected-Technical | - | Rejected-Technical Two Class Below | |
| 4 | Rejected-Technical | - | Rejected-Technical Uploaded PayOrder issued by Co-operative Bank |
| Sl No | Description | Qty | Unit | Horizon Construction L1 | om construction L2 |
|---|---|---|---|---|---|
| 1.00SCH 'A' PART - I: BUILDING/STRUCTURES Note: Ser. Item No. 1.01 & 1.02 of this schedule are not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only. Bidders shall insert their rate in Col-6 only | |||||
| 1.01 | Construction of Watch tower without rest room in RCC structure with permanent specification (G+3), complete all as shown on arch and structural drawings and all as specified. | 2 | EACH BLOCK | 17,00,000 ₹34,00,000 Lowest | 18,11,000 ₹36,22,000 |
| 1.02 | Construction of Guard Room with permanent specification with RCC framed structure, complete all as shown on arch and structural drawings and all as specified. | 2 | EACH BLOCK | 14,00,000 ₹28,00,000 Lowest | 16,82,000 ₹33,64,000 |
| 1.03NOTE: Schedule ‘A’ Part II to XII items have been Prepriced by MES and the Bidders shall insert their lumpsum cost in green field under Column-6 only. | |||||
| 2.00 | Total amount of Sch 'A' Part-II (EARTHWORK AND EXCAVATION, SITE CLEARANCE AND DEVELOPMENT) | 1 | LUMP SUM | 2,98,536.85 ₹2,98,536.85 Lowest | 5,54,754.23 ₹5,54,754.23 |
| 3.00 | Total amount of Sch 'A' Part - III (INTERNAL WATER SUPPLY) | 1 | LUMP SUM | 55,618.58 ₹55,618.58 | 52,193.65 ₹52,193.65 Lowest |
| 4.00 | Total amount of Sch 'A' Part - IV (INTERNAL ELECTRIFICATION) | 1 | LUMP SUM | 2,61,291.98 ₹2,61,291.98 | 2,07,936.94 ₹2,07,936.94 Lowest |
| 5.00 | Total amount of Sch 'A' Part - V (LIGHTNING PROTECTION) | 1 | LUMP SUM | 39,775 ₹39,775 | 24,182.34 ₹24,182.34 Lowest |
| 6.00 | Total amount of Sch 'A' Part - VI (SEARCH LIGHT) | 1 | LUMP SUM | 26,800 ₹26,800 | 11,903.06 ₹11,903.06 Lowest |
| 7.00 | Total amount of Sch 'A' Part- VII (STATIC WATER TANK) | 1 | LUMP SUM | 1,87,983 ₹1,87,983 | 1,51,697.29 ₹1,51,697.29 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2 L
Closing Date
24 Aug 2026, 6:00 pmClosed
COMMANDER WORKS ENGINEER PUNE - 411001
HEADQUARTERS COMMANDER WORKS ENGINEERS GEN CARIAPPA MARG, PUNE-411 001
81824 PROVN OF 02 X WATCH TOWERS ALONGWITH REST ROOMS/ ALLIED FACILITIES FOR DSC GDS AND APPROACH RDS TO THE TOWERS IN VARIOUS LOCATIONS AT NDA KHADAKWASLA (PH-II)
2026_MES_775981_1
81824 CWE PUNE
Open Tender
Civil Works
Lump-sum
270 days
GE (P) (NDA) KHADAKWASLA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹1,000
GE (P) (NDA) Khadakwasla
₹2 L
Yes
23 Sept 2026
2 Jul 2026
31 Aug 2026
2 Jul 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SCH 'A' PART - I: BUILDING/STRUCTURES
Note: Ser. Item No. 1.01 & 1.02 of this schedule are not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 5 signifies this fact only. Bidders shall insert their rate in Col-6 only | - | - | - | - |
| - | Construction of Watch tower without rest room in RCC structure with permanent specification (G+3), complete all as shown on arch and structural drawings and all as specified. | 2 | EACH BLOCK | - | - |
| - | Construction of Guard Room with permanent specification with RCC framed structure, complete all as shown on arch and structural drawings and all as specified. | 2 | EACH BLOCK | - | - |
| - | Total amount of Sch 'A' Part-II (EARTHWORK AND EXCAVATION, SITE CLEARANCE AND DEVELOPMENT) | 1 | LUMP SUM | 6,52,652.04 | ₹6,52,652.04 |
| - | Total amount of Sch 'A' Part - III (INTERNAL WATER SUPPLY) | 1 | LUMP SUM | 61,404.29 | ₹61,404.29 |
| - | Total amount of Sch 'A' Part - IV (INTERNAL ELECTRIFICATION) | 1 | LUMP SUM | 2,36,291.98 | ₹2,36,291.98 |
| - | Total amount of Sch 'A' Part - V (LIGHTNING PROTECTION) | 1 | LUMP SUM | 28,449.81 | ₹28,449.81 |
| - | Total amount of Sch 'A' Part - VI (SEARCH LIGHT) | 1 | LUMP SUM | 14,003.6 | ₹14,003.6 |
| - | Total amount of Sch 'A' Part- VII (STATIC WATER TANK) | 1 | LUMP SUM | 1,78,467.4 | ₹1,78,467.4 |
| - | Total amount of Sch 'A' Part-VIII (ROAD/PATH/CULVERT) | 1 | LUMP SUM | 18,70,076.23 | ₹18,70,076.23 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
WatchTowerDrg_merged.pdf
Additional Documents • 12.47 MB
BOQ_868947.xls
BOQ • 0.34 MB
1_GenPages.pdf
Tender Documents • 4.31 MB
2_SOC.pdf
Tender Documents • 0.80 MB
3_PS.pdf
Tender Documents • 1.23 MB
81824CorrigendumNo3Drgs.pdf
PDF • 7.61 MB
81824CorrigendumNo2Date.pdf
PDF • 0.34 MB
81824CorrigendumNo1Date.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .