Tender Value
₹82.5 L
EMD Value
₹82,515
Closing Date
3 Sept 2026, 5:30 pm
SE (A), SZ, Brahmapur
O/o SE(A),SZ,Brahmapur RITE Campus, Rangeilunda, Ganjam, Odisha - 760007
Construction of ADO office at Bhawanipatna
2026_AGRIL_138171_1
SE(Agril.) SZ 01/2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
Bhawanipatna, Dist-Kalahandi
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹82,515
Yes
17 Aug 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
3 Sept 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ground Floor | - | - | - | - |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | - | Sqm | 8.54 | - |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. | - | Nos. | 381.21 | - |
| 4 | Dismantling and removing R.C.C. columns, beams, slab, staircase, landing & lintels including stacking the useful materials for reuse and removing the debris within 50m lead | - | Cum | 1,744.48 | - |
| 5 | Dismantling Brick / Tile work in cement mortar including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 1 | Cum | 428.91 | ₹428.48 |
| 6 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling etc. complete including cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 0.4 | Cum | 280.08 | ₹111.75 |
| 7 | Filling in foundation and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge | 0.6 | Cum | 186.72 | ₹112.03 |
| 8 | Filling foundation and plinth with sand well watered and rammed etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 0.6 | Cum | 938.4 | ₹563.04 |
| 9 | Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 0.4 | Cum | 6,100.62 | ₹2,440.25 |
| 10 | Cement concrete of proportion (1:2:4) in foundation and floors using 20 mm size clean hard black crusher broken granite stone metal etc. complete including cost, conveyance, royalty and taxes of all materials and cost of all labour with T&P required for the work etc. complete as per the direction for the EIC. | 1 | Cum | 7,757.52 | ₹7,749.76 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
BOQ_606192.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].