Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
22 Jul 2026, 6:00 pmClosed
COMMISSIONER MUNICIPAL COUNCIL CHITTORGARH
MUNICIPAL COUNCIL CHITTORGARH
NIT NO. 08 S.NO. 01
2026_DLB_574695_1
NIRMAN/2026-27/3736-40 DATED 08.07.2026
Open Tender
Electrical Works
Item Rate
90 days
CHITTORGARH
2 documents required · 2 mandatory
₹500
500 COMM. MC CHITTORGARH 500 MD RISL JAIPUR
₹1 L
Yes
23 Jul 2026
13 Jul 2026
23 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, engineering, supply, civil work, erection, testing, and commissioning of a 110 kw Grid-Connected Solar PV Power Plant(Rooftop/Ground Mounted Solution consisting of Modules, String Inverter, structure, Earthing, ightning arrestor. solar meter, and net meter with a remote monitoring system, The contractor shall provide layout plans, electrical solar calculations with a PVsyst report, GA Drawings, and technical support to vet the design and drawings from NIT/IT/ Government engineering college. The Module Mounting Structure shall be designed for a wind speed of 170kmph and approved by an IIT/NIT or any Government engineering. The system will feature Top-con Bifacial N-Type modules carrving a 30-year warranty, a wall mounted MPPT-based String lnverter with a 10-year hardware warranty, Polycab DC and AC armoured cabling, a Have!ls/Schneider ACDB panel, chemical earth points with copper-bondedrods, an Eariy Streamer Type lightning arrester with a 107m radius, and a water sprinkler system. Meters must be DISCOM testing lab approved, and remote monitoring is subject to client internet availability. The contractor will manage turnkey DISCOM liaison work, MNRE, and CElG approvals -excluding DISCOM receipt application demand/test charges and client sCoped load extensions or name changes -while guaranteeing a minimum generation of 1,400 Units/KW/Annum. Complete installation must be finished within 30 to 55 days from the token amount or face compensation penalties for monthly electricity generation value if delayed past 4 months, and it includes a 1-year Defect Liability Period after commissioning aloneside a 5-year Annual Maintenance Contract encompassing 4 visits per year. | 110 | KWP | 100 | ₹11,000 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
TermsAndConditions.pdf
Tender Documents • 5.11 MB
BOQ_1022246.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .