Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.1 L+₹4,954.20 (1.65%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.3 L+₹26,042.08 (8.67%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹3.4 L+₹42,486.03 (14.1%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹3.5 L+₹49,992.39 (16.6%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
8 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO POONCH
Forest Complex Poonch
As per Nit and BoQ
2026_FD_326753_1
e-NIT No. 19 of 2026-27
Open Tender
Civil Works
Percentage
60 days
POONCH
Kindly refer attachment
2 documents required · 2 mandatory
₹500
DFO POONCH
₹10,000
Yes
22 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (ROAD) Preparation of subgrade by excavating earth to an average of 22.5 cm depth, dressing to camber and consolidation with road roller of 8-12 tonne capacity including making good the undulation etc. and disposal of surplus earth upto 50 meters. | 234.2 | Sqm | 153 | ₹35,832.75 |
| 2 | (CHAINLINK FENCING) Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and
removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 55.02 | Sqm | 12.49 | ₹687.19 |
| 3 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 14.5 | Cum | 479.3 | ₹6,949.85 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed | 2.58 | Cum | 4,286.5 | ₹11,046.31 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 40mm nominal size) Crushed | 5.58 | Cum | 6,591.25 | ₹36,746.22 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 2 coarse sand :4 graded stone aggregate 20mm nominal size) Crushed | 10.88 | Cum | 5,733.6 | ₹62,352.9 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 107.96 | Sqm | 286.3 | ₹30,909.81 |
| 8 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded | 1,044.24 | Kgs | 138.2 | ₹1,44,313.28 |
| 9 | Providing and fixing G.I chain link Fabric Fencing of required width in mesh size 50x50mm including strength with 2mm dia wire or nut, bolts and washers as required complete as per direction of engineer -in - charge made of G.I wire of dia 4mm | 165.06 | Sqm | 903.25 | ₹1,49,086.83 |
| 10 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works. (including animals and othe items) | 90.78 | Sqm | 131.85 | ₹11,969.47 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1105308.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .