Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC Below Quoted | |
| 2 | L2₹13.1 L+₹20,596.37 (1.60%)Rejected-AOC | L2 | Rejected-AOC Above Quoted |
| Sl No | Description | Qty | Unit | P E BIJU L2 | DURAIRAJ.K L1 |
|---|---|---|---|---|---|
| 1.10Renewal BT Nelliyampathi- Karikutty Bridge road of Cherangode Panchayat IN GUDALUR BLOCK, THE NILGIRIS DISTRICT - TN-PK | |||||
| 1.20 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc., upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,200 | Cum | 4,774.57 ₹1,91,555.75 Lowest | 4,774.57 ₹1,91,555.75 Lowest |
| 1.30 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 90 | cum | 150 ₹60,187.5 | 106.5 ₹42,733.13 Lowest |
| 1.40 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it | 900 | Cum | 22.01 ₹8,831.51 Lowest | 22.01 ₹8,831.51 Lowest |
| 1.50 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 900 | Sqm | 40.72 ₹60,011.1 Lowest | 40.72 ₹60,011.1 Lowest |
| 1.60 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 2,100 | Cum | 416.67 ₹7,81,256.25 Lowest | 416.67 ₹7,81,256.25 Lowest |
| 1.70 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. i as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 3,000 | Sqm | 574.65 ₹2,298.6 Lowest | 574.65 ₹2,298.6 Lowest |
| 1.80 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, | 135 | Sqm | 2,197 ₹2,197 Lowest | 2,197 ₹2,197 Lowest |
| 1.90 | Provision For HM Stone | 4 | No | 1,99,141 ₹1,99,141 | 1,95,999 ₹1,95,999 Lowest |
| 2.00 | Provision For KM Stone | 1 | No | - | - |
Tender Value
₹13 L
EMD Value
₹13,000
Closing Date
19 Feb 2026, 3:00 pmClosed
Block Development Oficcer (BP)
Block Development Officer Panchayat Union Gudalur
Renewal BT work at Kayunni Pattavayal road 108 of SH road to Kurunji Nagar road 0/0-0/800 of Cherangode Panchayat
2026_RDTN_656162_1
A1/E-10033419/2025/SFC Dist Panchayat
Open Tender
Civil Works
Item Wise
90 days
Gudalur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
19 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
12 Feb 2026 - 19 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | Renewal BT Nelliyampathi- Karikutty Bridge road of Cherangode Panchayat IN GUDALUR BLOCK, THE NILGIRIS DISTRICT - TN-PK | - | - | - | - |
| 1.2 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc., upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,200 | Cum | - | - |
| 1.3 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 90 | cum | - | - |
| 1.4 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it | 900 | Cum | - | - |
| 1.5 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 900 | Sqm | - | - |
| 1.6 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | - | Cum | - | - |
| 1.7 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. i as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 3,000 | Sqm | - | - |
| 1.8 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, | 135 | Sqm | - | - |
| 1.9 | Provision For HM Stone | 4 | No | - | - |
| 2 | Provision For KM Stone | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
PriceBid.pdf
Tender Documents • 0.33 MB
TechnicalBid.pdf
Tender Documents • 0.70 MB
BOQ_786811.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .