Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51,200Accepted-AOC | ₹51,200 Quoted ₹61,000 | 1 | Accepted-AOC Work order issued |
| Sl No | Description | Qty | Unit | Deepali Consulting Engineers L1 |
|---|---|---|---|---|
| 0.00Consultancy work | ||||
| 1.01 | Advancing boreholes 100/150 dia. Each upto a depth of 5mtr or refusal whichever is earlier including conducting SPTs at every 1.5m depth of borehole, collecting disturbed/ undisturbed soil samples from each borehole at suitable vertical interval water table depth in each borehole , performing all necessary soil properties test on the sample thus obtained , preparation and submission of technical report suggestion type depth and allowable bearing capacity of foundation complete in three copies. ( Time of completion of this job is 15 days from the date issue of work order )e preprationand submission of detailed soil investigation report in triplicate. | 4 | Each | 4,000 ₹16,000 Lowest |
| 1.02 | Conducting DCP test each upto 10mtr depth or refusal whichever is earlier adjacent to boreholes including observing and plotting the sub-soil dynamic resistance with depth. ( Time of completion of this job is 15 days from the date issue of work order ) | 4 | Each | 1,000 ₹4,000 Lowest |
| 1.03 | Extra for additional depth for item no.1 for every metre depth (Time of completion of this job is 15 days from the date issue of work order 4X5 m=20 m) | 20 | Each | 800 ₹16,000 Lowest |
| 1.04 | Consultancy services for the structural design and drawing for the Dispensary building, Carrying out structural design including earthquake factor, design including soil report i/c bar bending schedule and supplying of six sets of structural drawings including layout drawings including site visit whenever required including Issuance of all corrected drawings as required by the engineer-in-charge for structure drawings for which no extra payment will be made. | 1 | Each | 25,000 ₹25,000 Lowest |
| 1.05 | Note 1: - Any revision in structural drawings/ design due to site constraints or otherwise shall be carried out by the constulant at his own cost as per direction of Engineer in charge & will provide 6 nos of sets of structural drawing/ design. No extra payment will be made for supplying for corrected drawing as required by the Engineer in charge.
2. The time period of the consultancy will be period for the mainproject and extended period if any up to the completion of the project, nothing extra shall be payble to the consultant for any extended period for the construction work.
(i) All structural drawings along with soil report in six sets will be issued within 30 days from the date of issue of work order
(ii) Monthly inspections of the site as required by the engineer-in-charge
(iii) A penelty of 1% per week, maximum 10% of contractual amount will be levied on the delay in providing any design & drawing by the consultant.
(iv) Contract can be terminated at any time for the delay & any lapse on the part of consultant and a penelty of 10% will be levied.
(v) Mode of payment
(a) 40% on submission structural drawings.
(b) 20% on completion of 50% strcutural work.
(c) 20% on completion of all strcutural work.
(d) 20% on completion of total work. | - | - | - |
Tender Value
₹68,300
EMD Value
₹1,400
Closing Date
5 Aug 2025, 3:00 pmClosed
EE (Pr) SZ
EE (Pr) SZ Under Sewa Nagar Flyover, New Delhi-110003
Soil testing and providing consultancy services for Construction of new dispensary building in Sangam Vihar, Ward No. 163 South Zone.
2025_MCD_243026_1
EE-Project South-I/SZ/TC/2025-26/7
Open Tender
Civil Works - Others
Item Rate
30 days
Work
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹1,400
20 Feb 2026
29 Jul 2025
5 Aug 2025
29 Jul 2025
5 Aug 2025
29 Jul 2025
Amount
Consultancy work
Advancing boreholes 100/150 dia. Each upto a depth of 5mtr or refusal whichever is earlier including conducting SPTs at every 1.5m depth of borehole, collecting disturbed/ undisturbed soil samples from each borehole at suitable vertical interval water table depth in each borehole , performing all necessary soil properties test on the sample thus obtained , preparation and submission of technical report suggestion type depth and allowable bearing capacity of foundation complete in three copies. ( Time of completion of this job is 15 days from the date issue of work order )e preprationand submission of detailed soil investigation report in triplicate.
Conducting DCP test each upto 10mtr depth or refusal whichever is earlier adjacent to boreholes including observing and plotting the sub-soil dynamic resistance with depth. ( Time of completion of this job is 15 days from the date issue of work order )
Extra for additional depth for item no.1 for every metre depth (Time of completion of this job is 15 days from the date issue of work order 4X5 m=20 m)
Consultancy services for the structural design and drawing for the Dispensary building, Carrying out structural design including earthquake factor, design including soil report i/c bar bending schedule and supplying of six sets of structural drawings including layout drawings including site visit whenever required including Issuance of all corrected drawings as required by the engineer-in-charge for structure drawings for which no extra payment will be made.
Note 1: - Any revision in structural drawings/ design due to site constraints or otherwise shall be carried out by the constulant at his own cost as per direction of Engineer in charge & will provide 6 nos of sets of structural drawing/ design. No extra payment will be made for supplying for corrected drawing as required by the Engineer in charge. 2. The time period of the consultancy will be period for the mainproject and extended period if any up to the completion of the project, nothing extra shall be payble to the consultant for any extended period for the construction work. (i) All structural drawings along with soil report in six sets will be issued within 30 days from the date of issue of work order (ii) Monthly inspections of the site as required by the engineer-in-charge (iii) A penelty of 1% per week, maximum 10% of contractual amount will be levied on the delay in providing any design & drawing by the consultant. (iv) Contract can be terminated at any time for the delay & any lapse on the part of consultant and a penelty of 10% will be levied. (v) Mode of payment (a) 40% on submission structural drawings. (b) 20% on completion of 50% strcutural work. (c) 20% on completion of all strcutural work. (d) 20% on completion of total work.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .