Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance H NO 01 LANE NO 13 MAULANA AZAD COLONY LOWADIH NAMKUM RANCHI JHARKHAND 834010 | RANCHI | RANCHI | JHARKHAND | 834010 | -0.20% | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹10.4 LAdmitted-Finance 1454 C JAGRAN MAIDAN LOWADIH NAMKUM RANCHI JHARKHAND 834010 | RANCHI | RANCHI | JHARKHAND | 834010 | +2.00% | ₹10.4 L | L2 | Admitted-Finance |
Tender Value
₹10.2 L
EMD Value
₹20,500
Closing Date
1 Apr 2026, 5:00 pmClosed
EE RMC
RMC
Construction of PCC road at Shaheb gali under ward No 22
2026_UDD_111872_9
241/ENG 2026
Open Tender
Civil Works
90 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹20,500
28 Apr 2026
24 Mar 2026
2 Apr 2026
24 Mar 2026
1 Apr 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Labour for site clearence before and after the work etc. | - | Nos. | - | - |
| 2Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | |||||
| 3Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve at Quary | |||||
| 4Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | |||||
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | |||||
| 6Centering and Shuttering including strutting, propping etc and removal of from for Foundation , footing , bases of columns etc for mass concrete. | |||||
| 7(i) Sand (Lead Upto 49 km) | |||||
| 8(ii) Stone Dust (Lead 22 KM) | |||||
| 9(iii) Stone Boulder (Lead 36 KM) | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_151188.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid