Loading…
Loading…
| # | Company | Amount |
|---|---|---|
| 1 | ₹42,500 | ₹42,500 |
Tender Value
Refer Docs
EMD Value
₹20 L
Closing Date
3 Jun 2026, 2:15 pmClosed
SHELL KIT (MEMU TC JK)
02261283
02261283
Open - Indigenous
Chennai, Unknown (Unspecified Location)
₹0
₹20 L
2 Jul 2026
11 May 2026
Description :Shell KIT for MEMU TC1 JK 941 A. Roof Assembly 94516001 000 01, Alt 'Nil' - 1 No. Location of sidewall
alarm End 94515002 000 01, Alt Nil' - 1 No. FIRM SHALL FULFILL THE MANUFACTURING FACILITY AS PER ICF/MD/SPE CN-200, ISSUE STATUS 01, REV 04 WITH AMENDMENT NO 01. FIRM SHALL FULFILL THE MANUFACTURING FACILITY A S PER ICF/MD/SPECN-315, ISSUE STATUS.01,REV.00 WITH AMENDMENT NO 01. B.SUPPLY OF ONE COACH SET OF BO DY SHELL ITEMS AND PARTITION FRAMES FOR MEMU/TC/JK 941 TO DRAWING NOS: 1. 94410076 000 01 ALT Nil -2 N os. 2. 94510007 000 01 ALT 'b' - 1 No. 3. 94510002 000 01 ALT 'a' - 1 No. 4. 94410072 000 01 ALT Nil - 2 Nos. 5. 94
HE MANUFACTURING FACILITY AS PER ICF/MD/SPEC-147, ISSUE STATUS.01 REV.02 WITH AMENDMENT NO.02. Speci al Condition : PACKING AS PER ICF/J&T/MISC-2201,ALT 'f'. PACKING AS PER ICF/J&T/SK-1809,ALT 'a'. PACKING CONDI TION AS PER DRG.NO.ICF/J&T/MISC-2487, ALT 'b' THE UNDERFRAMES HOULD BE SUPPLIED AS NORMAL SIDE UP & S IDE BEARER SIDE DOWN. PACKING CONDITION AS PER ICF/J&T/SK-1865, Alt 'a'. STAGE INSPECTION. (a) Raw Material Stage # Ensure the raw material used using portable spectrometer (b) Jig stage # Assembly of front part with sole b ar. # Assembly of modular frame arrangement. # Weld parameters to be checked & recorded (c) Trestle stage # Ma rking, Drilling & Tapping of holes wherever necessary. # Marking & placing of detail items. # Complete welding whe rever necessary. # Weld parameters to be checked & recorded # Assembly & Welding of trough sheets. # Dimensio nal & Visual checks. # Punching of Serial No & ensuring proper traceability. (d) Surface preparation and painting sta ge. # Short/Sand blast to the requirements. # Painting process as per the specification. # Visual inspection. # Final product Inspection. Note: Application of Aluminium welding coat to RCF spec MDTS-28272 latest revision on top surf ace of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corr ossion. [SAFETY ITEM] [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lac s]] Consignee Shell Depot/ICF,Chennai, ICF Tamil Nadu 31.00 Set Product Inspection:Stage 1: Raw Material Stage (Ref: Description) (100% of PO Qty ), Stage 2: Jig Inspection Details stage (Ref: Description) (100% of PO Qty ), Stage 3: Trestle stage (Ref: Description) (100% of PO Qty ), Stage 4: Surface preparation and painting stage (Ref: Desc) (100% of PO Qty )
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5752243.pdf
ATTACHMENT
5752459.pdf
ATTACHMENT
5752442.pdf
ATTACHMENT
5752444.pdf
ATTACHMENT
5752447.pdf
ATTACHMENT
5752449.pdf
ATTACHMENT
5752450.pdf
ATTACHMENT
5752452.pdf
ATTACHMENT
5752453.pdf
ATTACHMENT
5752455.pdf
ATTACHMENT
5752458.pdf
ATTACHMENT
5752472.pdf
ATTACHMENT
5752470.pdf
ATTACHMENT
5752469.pdf
ATTACHMENT
5752468.pdf
ATTACHMENT
5752244.pdf
ATTACHMENT
Download all tender documents and submit your bid