Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.7 L+₹13,637.12 (1.60%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.3 L+₹72,577.20 (8.51%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹11.6 L
EMD Value
₹23,120
Closing Date
6 Jul 2026, 2:00 pmClosed
Xen Jal Shakti Hydraulic Division Kishtwar
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to BOQ
2026_PHE_313141_5
e-NIT 29 of 2026-27 Dated 20-06-2026
Open Tender
Civil Works
Percentage
60 days
Xen Jal Shakti Hydraulic Division Kishtwar
Refer to e-NIT/SBD
2 documents required · 2 mandatory
₹600
Xen Jal Shakti Hydraulic Division Kishtwar
₹23,120
Yes
Xen Jal Shakti Hydraulic Division Kishtwar
7 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
6 Jul 2026
20 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of D.I Pipes 150 mm dia from nearest store to road side of work for an average distance of 267 km by Mechanical Transport | - | m | - | - |
| 2 | Carriage of D.I pipes 150 mm dia from road side to site of work for an avg. distance 01 km by Head Load | - | m | 1 | - |
| 3 | Carriage of G.I Pipes 100 mm dia from nearest store to road side of work for an average distance of 267 km by Mechanical Transport | - | m | - | - |
| 4 | Carriage of G.I pipes 100 mm dia from road side to site of work for an avg. distance 01 km by Head Load | - | m | - | - |
| 5 | Carriage of HDPE Pipes from nearest store to road side of work for an average distance of 267 km by Mechanical Transport | - | MT | - | - |
| 6 | Carriage of HDPE pipes from road side to site of work for an avg. distance 01 km by Head Load | - | MT | 1 | - |
| 7 | Carriage of G.I Pipes from nearest store to road side of work for an average distance of 267 km by Mechanical Transport | - | MT | - | - |
| 8 | Carriage of G.I pipes from road side to site of work for an avg. distance 01 km by Head Load | - | MT | 1 | - |
| 9 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | - | Cum | - | - |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed Ordinary Rock | - | Cum | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_1013423.xls
BOQ • 0.25 MB
Extension29.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .