Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
25 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDER
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderer shall submit requisite information as per Annexure-VIB of GCC, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
a. The tenderer must have successfully completed any of the following during last 07 [seven] years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender
Similar nature of work: "Execution of any Signalling or Telecom work"
36 conditions · 7 needing a document upload
Submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number
In case the Tenderer is a Partnership Firm: [i] A notarized copy Partnership deed. [ii] A notarized or registered Power of Attorney (duly registered as per prevailing law) in favour of an individual to sign the tender documents and create liability against the Firm. [iii] PAN / TAN number of Partnership firm (PAN / TAN number in the name of any of the constituent partners shall not be considered).
In case the Tender is a HUF: (i) A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. and (iii) All other documents in terms of explanatory notes in clause 10 of IRGCC- 2022.
In case the Tender is a Sole Proprietorship Firm: (i) All other documents in terms of explanatory notes in clause 10 of IRGCC- 2022.
In case the Tenderer is a Company registered under Companies Act-2013:(i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company. (ii) A copy of Certificate of Incorporation. (iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. and (iv) Copy of PAN number of the Company.
In case the Tenderer is a LLP Firm registered under LLP Act-2008 (i) a copy of LLP Agreement, (ii) a copy of Certificate of Incorporation. (iii) a copy of Power of Attorney/Authorisation issued by the LLP Firm in favour of the individual to sign the tender on behalf of the LLP Firm and create liability against the Firm. and (iv) copy of PAN number of the LLP Firm.
In case the Tenderer is a Registered Society & Registered Trust: (i) A copy of the Certificate of Registration. (ii) Deed of Formation. (iii) A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv) copy of PAN number of the Society/Trust
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If the mandatory documents asked for in the E-Tender Document are not submitted along with the tender, the tender submitted otherwise will be treated as incomplete and will not be considered.
The quantities shown in above Schedule are approximate and are as a guide to give the tenderer(s) an idea of quantum of work involved. The Railway reserves the right to increase/ decrease and/or delete or include any of the quantities given above and no extra rate will be allowed on this account.
All rates quoted in the tender shall be deemed to be inclusive of all Taxes royalties payable by the contractor s to the Government or public body or local authority and no additional amount will be paid or claim entertained on this account by the Railway.
It is responsibility of the tenderer that they ensure to see any Corrigendum of the tender to check the corrigendum on the website from time to time.
The Tenderer(s) shall quote his / their rates as a percentage above or below the Schedule of Rates of South Western Railway as applicable to Mysore Division except where he/they are required to quote item rates and must tender for all the items shown in the Schedule of approximate quantities attached. The quantities shown in the attached Schedule are given as a guide and are approximate only and are subject to variation according to the needs of the Railway. The Railway does not guarantee work under each item of the Schedule.
The works are required to be completed within a period of months as mentioned in website from the date of issue of acceptance letter.
The Tenderer(s) shall keep the offer open for a minimum period of 60 days from the date of opening of the Tender. It is understood that the tender documents have been sold/issued to the Tenderer(s) and the Tenderer(s), is / are permitted to tender in consideration of the stipulation on his / their part that after submitting his / their tender subject to the period being extended further, if required by mutual agreement from time to time, he will not resale from his offer or modify the terms and conditions thereof in a manner not acceptable to the DRM/S&T/Divisional Engineer of SW Railway, Should the tenderer fail to observe or comply with the foregoing stipulation, the amount deposited as Earnest Money for the due performance of the above stipulation, shall be forfeited to the Railway.
If the tender is accepted, the amount of Earnest Money will be retained and adjusted as Security Deposit for the due and faithful fulfillment of the contract. This amount of Security Deposit shall be forfeited, if the Tenderer(s)/Contractor(s) fail to execute the Agreement Bond within 7 days after receipt of notice issued by Railway that such documents are ready or to commence the work within 15 days after receipt of the order to that effect.
Rights of the Railway to Deal with Tender: The authority for the acceptance of the tender will rest with the Railway. It shall not be obligatory on the said authority to accept the lowest tender or any other tender and no Tenderer's(s) shall demand neither any explanation for the cause of rejection of his /their tender nor the Railway to assign reasons for declining to consider or reject any particular tender or tenders.
If the tenderer(s) expires after the submission of his / their tender or after the acceptance of his their tender, the Railway shall deem such tender cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled, unless the firm retains its character.
No post tender correspondence will be permitted and the tender shall be decided based on the documents uploaded with the offer only.
The Tenderer's shall not add any conditions on their own in the tender documents while submitting their offer. Any such conditions if stated and if tender conditions are in violation of the Railway s, may lead to summary rejection of the offer. Railway reserves the right to reject such tenders summarily without assigning any reasons whatsoever
Tender cost is not transferable and the amount once paid is non- refundable
The responsibility of uploading the correct documents lies with the Tenderer's. In case, the documents uploaded are found manipulated/forged, the offers of such Tenderer's will not be considered and such Tenderer's are liable to be debarred to participate for future works duly forfeiting their Earnest Money and the tenderer/contractor shall have no claims whatsoever in this regard. Railway reserves the right to determine/rescind the contract entered into in case of such false certificates/documents at any stage of the contract treating it as default of the contractor
Tender Opening will be done any time after the tender closing time. Tenderers are not required to be present during the opening. Railway reserves right to open the tender any time after the time of closing of tender.
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer
Enhancement of earthing reliability by providing additional MF earth, provision of SPDs and shifting of SPDs to 0.5mtrs to MEEB as per RDSO TAN guidelines at 60 stations over MYS division.
06-SNT-MYS-2026
06-SNT-MYS-2026
Open
Works - General
9 Months
Dharwad, Karnataka
₹0
₹3.9 L
25 Jun 2026
3 Jun 2026
11 Jun 2026
52 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,76,05,525 | ||
| — | — | — | Above/ 38000.00 Below/P | ||
| Chapter 6: Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. (Laying of cables is not included in this item). | — | 500.00 | — | — | |
| — | — | — | Above/ 9000.00 Below/P | ||
| Chapter 6: Refilling of cable trench 1m depth by 0.3m width throughout, with earth after laying of cables, and consolidating the trench by ramming and levelling. | — | 500.00 | — | — | |
| — | — | — | Above/ 124800.00 Below/P | ||
| Chapter 6: Concreting of cable laid in the trench or GI pipe/DWC/HDPE pipe in which cable is already laid to a size of 300x300mm with 1:3:6 mortar. (All the materials required for the work should be supplied by the contractor). | — | 200.00 | — | — | |
| — | — | — | Above/ 42000.00 Below/P | ||
| Chapter 6: Laying of Signaling/Power/Telecommunication cables as per cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc. (Supply of cables is not included in this item). | — | 2000.00 | — | — | |
| — | — | — | Above/ 8502600.00 Below/P | ||
| Chapter 15: Supply of Basic material to construct Unit maintenance free earth as per RDSO spec. No. RDSO/SPN/197 Ver.1.0 or latest. consisting of a) copper bonded steel electrode of 3.0m long, 17.0 mm dia with copper bonding thickness mini 250 micron and UL listed and marked--1 no. b) Earth enhancement compound of RDSO approved brand supplied in sealed bags of min 10 Kgs-03 No. c) Copper strip of 150X25x6mm to terminate earth rod-1 No. d) Copper strip of 300X25x6mm (MEEB)-1 No. e) Copper strip of 150X25x6mm (SEEB)-1 nos | — | 300.00 | — | — | |
| — | — | — | Above/ 4635900.00 Below/P | ||
| Chapter 15: Installation of Unit Maintenance Free Earth Pit as per RDSO specification No.RDSO/SPN/197 Ver.1.0 or latest and as per Technical Specification | — | 300.00 | — | — | |
| — | — | — | Above/ 93382.00 Below/P | ||
| Chapter 15: Supply of Basic material to construct a Maintenance Free Ring Earth with Four Pits (For Interlocked Station, LC Gates/IB Signalling Application) for achieving less than one Ohm as per as per RDSO Spec No. RDSO/SPN/197 Ver.1.0 or latest consisting of a) copper bonded steel electrode of 3.0m long, 17.0 mm dia with copper bonding thickness mini 250 micron and UL listed and marked--4 no. b)Earth enhancement compound of RDSO approved brand supplied in sealed bags of min 10 Kgs-12 No. c) Copper strip of 150X25x6mm to terminate earth rod-4 No. d) Copper strip of 300X25x6mm (MEEB)-4 No. e) Copper strip of 150X25x6mm (SEEB)-4 no's | — | 1.00 | — | — | |
| — | — | — | Above/ 40720.00 Below/P | ||
| Chapter 15: Installation of Maintenance Free Ring Earth with Four Pits (For Interlocked LC Gates/IB Signalling Application) as per RDSO specification No. RDSO/SPN/197 Ver.1.0 or latest and as per Technical Specification. | — | 1.00 | — | — | |
| — | — | — | Above/ 286000.00 Below/P | ||
| Chapter 15: Supply of 25x3 mm Cu tape. | — | 400.00 | — | — | |
| — | — | — | Above/ 126400.00 Below/P | ||
| Chapter 15: Installation of 25x3 Sq mm Cu tape. | — | 400.00 | — | — | |
| — | — | — | Above/ 170100.00 Below/P | ||
| Chapter 15: Supply of 35 Sq mm Multi-strand Single Core PVC insulated Copper Cable as per IS: 694 for connecting Main Earth Electrode to MEEB in equipment room. Color: Green. | — | 300.00 | — | — | |
| — | — | — | Above/ 75900.00 Below/P | ||
| Chapter 15: Supply of 16 Sq mm Multi-strand Single Core PVC insulated Copper Cable as per IS: 694 for connecting MEEB to SEEB and SPDs to MEEB. Color: Green. | — | 300.00 | — | — | |
| — | — | — | Above/ 47700.00 Below/P | ||
| Chapter 15: Supply of 10 Sq mm Multi-strand Single Core PVC insulated Copper Cable as per IS: 694 for connecting SEEB to all equipment's. Color: Green. | — | 300.00 | — | — | |
| — | — | — | Above/ 60900.00 Below/P | ||
| Chapter 15: Installation of 35 sqmm single core Cu cable for connecting main earth electrode to equipment room (routing through GI pipe/DWC/HDPE/PVC conduit pipe of suitable size as per site requirement | — | 300.00 | — | — | |
| — | — | — | Above/ 129300.00 Below/P | ||
| Chapter 15: laying of 16 sqmm Cu cable/10 sqmm Cu cable between BRC and racks. The work includes mechanical connection by providing two Cu lugs and two steel screws, drilling to two holes and removal of powder coating on rack body, thimbles ties, etc. and routing the same as per site requirements. | — | 300.00 | — | — | |
| — | — | — | Above/ 29500.00 Below/P | ||
| Chapter 15: Supply of 50x6 mm GI Tape for interconnecting earth electrodes. | — | 50.00 | — | — | |
| — | — | — | Above/ 10250.00 Below/P | ||
| Chapter 15: Laying of 50x6 mm GI Tape for interconnecting earth electrodes. | — | 50.00 | — | — | |
| — | — | — | Above/ 1004283.00 Below/P | ||
| Chapter 15: Supply of Conventional lightening protection system consisting of Franklin rod of 16mm dia, single prong spike made of copper of length 600mm. Appropriate reducer/coupler for connecting Franklin rod and GI mast, GI mast approximately 1.5-inch dia, 6 mtr length with flanges for installation of franklin rod with all supporting accessories, such as guy rope, U-bolt, thimble, adjustable clamp, D-shakle, hook etc. | — | 19.00 | — | — | |
| — | — | — | Above/ 338770.00 Below/P | ||
| Chapter 15: Installation of Conventional lightening protection system consisting of Franklin rod, appropriate reducer/coupler, flanges and GI mast with all supporting accessories such as guy rope (6 mm GI wire), U-bolt, thimble, adjustable clamp, D-shakle hook, etc. | — | 19.00 | — | — | |
| — | — | — | Above/ 1269480.00 Below/P | ||
| Chapter 15: Supply of Lightening and surge arrester of class B and C suitable for single phase supply in TT network as per RDSO spec.no. RDSO/Spn/165/2023 ver 4.0 amd.1 or latest. | — | 40.00 | — | — | |
| — | — | — | Above/ 380820.00 Below/P | ||
| Chapter 15: Installation and commissioning of Class B and C arresters as supplied. These din rail mountable devices along with 63 amps HRC input fuse and fuse base shall be fixed in a wall mountable cabinet of size 450 x 250x150 mm made as MS steel of 20 gauge or better with IP31 protection and power coating. All the internal power wiring shall be made by using 10sq.mm cu cable. the PF contract of the class C arrestor shall also be wired using cable thickness of 2,5 sq.mm and terminated on a suitable terminal block. | — | 60.00 | — | — | |
| — | — | — | Above/ 72780.00 Below/P | ||
| Chapter 15: Carrying out exothermic welding for various conductors as per requirement. | — | 60.00 | — | — | |
| — | — | — | Above/ 116940.00 Below/P | ||
| Chapter 15: Exothermic welding materials (Cad weld or similar). | — | 60.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
AdvancedCorrectionSlips1to10_.pdf
ATTACHMENT
RevisedConservancyCharges.pdf
ATTACHMENT
Chapter_4B_TechnicalGuidelines1.pdf
ATTACHMENT
JPO_Digging.pdf
ATTACHMENT
PerformDetails.pdf
ATTACHMENT
lessthan10crores_Localcontents.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
TANonEarthingBondingSurgeandLightningprotection1.pdf
ATTACHMENT
TechSpec_Enhancementofearthingreliabilitybyp_2026060121.pdf
ATTACHMENT
TenderBook_Earthing2.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .