Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹83,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector( Dev), RDDA,Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.MNP-1/AGAMT 2021-22 of Mandapam Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242223_1
R7/5593/2021/dated 05.07.2022 MUD-1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer to Tender Document
6 documents required · 6 mandatory
₹0
₹83,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Kannathan Habitation, Deepening of Muniyasamy kovil oorani with construction of Retaining wall(36m), bathing ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Construction of Retaining wall (27.5m) Bathing Ghat and Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:1.5:3 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Brick work in cement mortor 1:5 mix using chamber bricks table moulded of size and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including,cost and conveyance of all materials to site and all labour
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Arapothu habitation, Deepening of Kamatchi Amman kovil oorani with construction of Retaining wall(28m), Bathing Ghat and Inlet
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Construction of Retaining wall (27.5m) Bathing Ghat and Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:1.5:3 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Brick work in cement mortor 1:5 mix using chamber bricks table moulded of size and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including,cost and conveyance of all materials to site and all labour
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Nallur Habitation, Deepening of Nedunkulam kanmai with reconstruction of sluice
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Providing and Fixing of RCC pipe600 mm dia
Construction of sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departmental officers
Providing cut stone roughly dressed and set in cement morter 1:3 (one cement and three sand ) including fixing in position etc complete as directed by the Engineer in charge of work complying with the standard specification
Supplying and erecting regid and smooth steel centring for sides and soffits inlcuding necessary sides, supports and scaffolding etc.,
Providing and placing in Position cement concrete of mix 1:2:4 (0ne cement, two sand, four aggregate) with nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/batching plant (to produce concrete of the specified characteristic strength of 15N/mm2 at 28days) including dewatering the placement site by bailing/pumping and by diverting wherever necessary laying the concrete in layers and in bays compacting and finishing the surface water curing so as to attain the profile and strength specified in the approved drawing and specification and including the cost component of providing rigid and smooth centering and shuttering wherever necessary various heights above and below ground level and as per the direction of the Engineers complying with standard specification.
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut where ever necessary in layers including breaking clods, sectioning etc.,
Watering and consolidation by Power roller including hire charges (D.71.B)
Venneervaikkal habitation, Deepening of venneervaikkal amman kovil oorani with construction of Bathing Ghat an Inlet
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Construction of Retaining wall (7.5m) Bathing Ghat and Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:1.5:3 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Brick work in cement mortor 1:5 mix using chamber bricks table moulded of size and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including,cost and conveyance of all materials to site and all labour
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Vilangulathur habitation, Deepening of Vilangulathur setti oorani with construction of Bathing Ghat and Inlet
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Construction of Retaining wall (14.5m) Bathing Ghat and Inlet
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:1.5:3 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Brick work in cement mortor 1:5 mix using chamber bricks table moulded of size and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including,cost and conveyance of all materials to site and all labour
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Karumal habitation, Deepening of Karumal peria kanmai with reconstruction of sluice
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Providing and Fixing of RCC pipe600 mm dia
Construction of sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departmental officers
Providing cut stone roughly dressed and set in cement morter 1:3 (one cement and three sand ) including fixing in position etc complete as directed by the Engineer in charge of work complying with the standard specification
Supplying and erecting regid and smooth steel centring for sides and soffits inlcuding necessary sides, supports and scaffolding etc.,
Providing and placing in Position cement concrete of mix 1:2:4 (0ne cement, two sand, four aggregate) with nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/batching plant (to produce concrete of the specified characteristic strength of 15N/mm2 at 28days) including dewatering the placement site by bailing/pumping and by diverting wherever necessary laying the concrete in layers and in bays compacting and finishing the surface water curing so as to attain the profile and strength specified in the approved drawing and specification and including the cost component of providing rigid and smooth centering and shuttering wherever necessary various heights above and below ground level and as per the direction of the Engineers complying with standard specification.
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut where ever necessary in layers including breaking clods, sectioning etc.,
Watering and consolidation by Power roller including hire charges (D.71.B)
Periyailai habitation, Deepening of Chinnailai kanmai with reconstruction of sluice
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Providing and Fixing of RCC pipe600 mm dia
Construction of sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departmental officers
Providing cut stone roughly dressed and set in cement morter 1:3 (one cement and three sand ) including fixing in position etc complete as directed by the Engineer in charge of work complying with the standard specification
Supplying and erecting regid and smooth steel centring for sides and soffits inlcuding necessary sides, supports and scaffolding etc.,
Providing and placing in Position cement concrete of mix 1:2:4 (0ne cement, two sand, four aggregate) with nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/batching plant (to produce concrete of the specified characteristic strength of 15N/mm2 at 28days) including dewatering the placement site by bailing/pumping and by diverting wherever necessary laying the concrete in layers and in bays compacting and finishing the surface water curing so as to attain the profile and strength specified in the approved drawing and specification and including the cost component of providing rigid and smooth centering and shuttering wherever necessary various heights above and below ground level and as per the direction of the Engineers complying with standard specification.
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut where ever necessary in layers including breaking clods, sectioning etc.,
Watering and consolidation by Power roller including hire charges (D.71.B)
Sadayaneri habitation, Deepening of Ayyanar kovil oorani with construction of Bathing Ghat and Inlet
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Construction of Retaining wall (7.5m) Bathing Ghat and Inlet
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:1.5:3 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Brick work in cement mortor 1:5 mix using chamber bricks table moulded of size and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12 mm thick including,cost and conveyance of all materials to site and all labour
Supply and cost of 900mm dia Hume Pipe including collar & all charges,etc. complete
Vadakku Kakkoor habitataion, Deepening of Pidarikulam kanmai with reconstruction of sluice
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Sectioning during forming bunds when earth mooving machineries,loories, and rollers are used for consolidation. (Annexure III - D.50D)
Providing and fixing of boundry stone
Providing and Fixing of RCC pipe600 mm dia
Construction of sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departmental officers
Providing cut stone roughly dressed and set in cement morter 1:3 (one cement and three sand ) including fixing in position etc complete as directed by the Engineer in charge of work complying with the standard specification
Supplying and erecting regid and smooth steel centring for sides and soffits inlcuding necessary sides, supports and scaffolding etc.,
Providing and placing in Position cement concrete of mix 1:2:4 (0ne cement, two sand, four aggregate) with nominal size of 20mm weigh batching the ingredients and mixing in approved mixers/batching plant (to produce concrete of the specified characteristic strength of 15N/mm2 at 28days) including dewatering the placement site by bailing/pumping and by diverting wherever necessary laying the concrete in layers and in bays compacting and finishing the surface water curing so as to attain the profile and strength specified in the approved drawing and specification and including the cost component of providing rigid and smooth centering and shuttering wherever necessary various heights above and below ground level and as per the direction of the Engineers complying with standard specification.
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut where ever necessary in layers including breaking clods, sectioning etc.,
Watering and consolidation by Power roller including hire charges (D.71.B)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K ARULANDHU
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .