Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.7 LAccepted-Finance R O CHOKLAMSAR | ₹64.7 L | L1 | Accepted-Finance successfully quoted lowest rate |
| 2 | L2₹69.0 L+₹4.3 L (6.68%)Accepted-Finance | ₹69.0 L+₹4.3 L (6.68%) | L2 | Accepted-Finance quoted high rate |
| 3 | L3₹80.5 L+₹15.8 L (24.5%)Accepted-Finance HOUSING COLONY | ₹80.5 L+₹15.8 L (24.5%) | L3 | Accepted-Finance quoted high rate |
| 4 | L4₹80.7 L+₹16.0 L (24.7%)Accepted-Finance | ₹80.7 L+₹16.0 L (24.7%) | L4 | Accepted-Finance quoted high rate |
| 5 | L5₹85.0 L+₹20.3 L (31.4%)Accepted-Finance | ₹85.0 L+₹20.3 L (31.4%) | L5 | Accepted-Finance quoted high rate |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
17 Jul 2026, 4:00 pmClosed
Executive Engineer REW Leh
REW Leh
Paving of road Shoulder by Way of P/L Interlocking Tiles at Village Stok Leh Length (2.91km)
2026_RDD_19174_1
23- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,440
Payable To Executive engineer REW Leh
₹2.9 L
25 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | 2,095.2 | Cum | 208.42 | ₹4,36,681.58 |
| 2 | Providing and laying dry 40mm crushed stone with proper compaction including cost of stones in Horizontal on level | 698.4 | Cum | 953.03 | ₹6,65,596.15 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 523.8 | Cum | 5,725.33 | ₹29,98,927.85 |
| 4 | Providing and laying 60mm thick factory made cement in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid joints with line sand etc. all complete as per the direction of Engineer-in-charge. | 6,984 | Sqm | 1,250.76 | ₹87,35,307.84 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources) | 163.69 | Cum | 6,417.78 | ₹10,50,526.41 |
| 6 | Carriage of Sang and Agg avg lead 10 km by MT | 939.89 | Cum | 271.53 | ₹2,55,208.33 |
| 7 | Carriage of crushed stone avg lead 10 km by MT | 698.4 | Cum | 319.46 | ₹2,23,110.86 |
| 8 | Carriage of cement avg lead 15 km by MT | 125.06 | Mton | 291.72 | ₹36,482.5 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_45654.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .