Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC N A | NEW DELHI | DELHI | 110001 | ₹6.5 L | L1 | Accepted-AOC Due to L1 and work is completed |
| 2 | L2₹8.1 LRejected-Finance NIH BIGHATAPUR KHARGONA | ₹8.1 L | L2 | Rejected-Finance Rejected due to higher rate to L1 |
| Sl No | Description | Qty | Unit | Rajesh Kumar Tiwari L1 | Chunni Lal L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle and thorney bushes without uprooting. | 12,400 | Sqm | 4.63 ₹57,362.40 | 5 ₹62,000 |
| 2.00 | Earth work in silt clearance of bridges and culverts on channals in all type of soil (wet/submerged) including lead upto 30m and lift upto 1.50m (clean height less than 1.00m) | 32.17 | Sqm | 69 ₹2,219.73 | 171.8 ₹5,526.81 |
| 3.00 | Earth work in silt clearance by Pocklain machine execuluding dressing but including all lead and lift T&P etc. As per Direction of Engineer-in-charge. | 7,372.07 | Cum | 32.66 ₹2.4 L | 40.78 ₹3.0 L |
| 4.00 | Earth work in silt clearance by JCB machine execuluding dressing but including all lead and lift T&P etc. As per Direction of Engineer-in-charge. | 6,654.89 | Cum | 33.66 ₹2.2 L | 42.8 ₹2.8 L |
| 5.00 | Earth work in silt clearance of dy/mr. by Labour excluding dressing but including all lead and lift, labour and T&P etc. As per Direction of Engineer-in-charge. | 144.44 | Cum | 59.6 ₹8,608.62 | 74.5 ₹10,760.78 |
| 6.00 | Dressing of excavated earth from silt clearance | 14,171.4 | Cum | 6.66 ₹94,381.52 | 8.5 ₹1.2 L |
| 7.00 | Scrapping internal section of existing channal above silted bed both bank including cutting or filling upto 8cm and its proper disposal (From km. 21.000 to 24.600) | 6,020 | Sqm | 3.76 ₹22,635.20 | 4.7 ₹28,294 |
Tender Value
₹8.6 L
EMD Value
₹17,220
Closing Date
24 Oct 2025, 10:00 amClosed
Executive Engineer
EE HDSC Hardoi
Silt clearance of Peng dy. from km. 0.000 to 17.699 (Lot-04)
2025_UPIDC_1082339_1
04/EE-HDSC/2025-26
Open Tender
Civil Works - Canal
20 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹17,220
22 May 2026
14 Oct 2025
24 Oct 2025
14 Oct 2025
24 Oct 2025
14 Oct 2025
Amount
Cleaning thick jungle and thorney bushes without uprooting.
Earth work in silt clearance of bridges and culverts on channals in all type of soil (wet/submerged) including lead upto 30m and lift upto 1.50m (clean height less than 1.00m)
Earth work in silt clearance by Pocklain machine execuluding dressing but including all lead and lift T&P etc. As per Direction of Engineer-in-charge.
Earth work in silt clearance by JCB machine execuluding dressing but including all lead and lift T&P etc. As per Direction of Engineer-in-charge.
Earth work in silt clearance of dy/mr. by Labour excluding dressing but including all lead and lift, labour and T&P etc. As per Direction of Engineer-in-charge.
Dressing of excavated earth from silt clearance
Scrapping internal section of existing channal above silted bed both bank including cutting or filling upto 8cm and its proper disposal (From km. 21.000 to 24.600)
Chunni Lal (BID ID -5613817)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1982035.xls
BOQ • 0.24 MB
TD04.pdf
Tender Documents • 1.15 MB
Download all tender documents and submit your bid