Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | ₹1.9 L | L1 | Accepted-Finance OK |
| 2 | L2₹2.0 LAccepted-Finance | ₹2.0 L | L2 | Accepted-Finance OK |
| 3 | L3₹2.3 LAccepted-Finance | ₹2.3 L | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | JAI AMBA CONSTRUCTION L1 | Vivek Electricals L2 | NEHA ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00fo|qr uxjh; forj.k [k.M&cqyUn'kgj ds vUrxZr iw.kZ tek ;kstuk en esa 33@11 ds0oh0 fo|qr midsUnz oyhiqjk ds dk;Z{ks= esa dY;k.k flag eSfMdy dkyst] dks 1293 fd0ok0 dk fo|qr la;kstu fuxZr djus dk dk;ZA | ||||||
| 2.00 | Carriage Of 33kv/11kv Ct/Pt Unit From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). | 1 | No. | 2,000 ₹2,000 | 2,100 ₹2,100 | 2,500 ₹2,500 |
| 3.00 | Carriage Of 33kv/11kv Metering Cubical Set Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). | 1 | No. | 5,000 ₹5,000 | 5,100 ₹5,100 | 5,500 ₹5,500 |
| 4.00 | Carriage Of 11 Kv Vcb Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km). | 1 | No. | 5,000 ₹5,000 | 5,100 ₹5,100 | 5,500 ₹5,500 |
| 5.00Carriage Of Xlpe Cable From Store Center To Je Sub Station/Any Other Place Including Loading And Unloading At Both End. | ||||||
| 6.00 | 11 KV XLPE CABLE 3x185, 3x300 SQ MM | 260 | MTR | 30 ₹7,800 | 35 ₹9,100 | 50 ₹13,000 |
| 7.00 | Laying Of 11 Kv Xlpe Cable 3x185, 3x300 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work. | 260 | Mtr. | 100 ₹26,000 | 120 ₹31,200 | 150 ₹39,000 |
| 8.00 | Open Trench Of 11 Kv Xlpe Cable 3x185/300 With Cost Of Digging, Bricks And Sand Completed In All Accessories. | 140 | Mtr. | 250 ₹35,000 | 260 ₹36,400 | 300 ₹42,000 |
| 9.00 | Making/Filling Of 11 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable | 8 | No. | 5,000 ₹40,000 | 5,100 ₹40,800 | 5,500 ₹44,000 |
| 10.00 | Safely Installing The 33 Kv/11 Kv Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge. | 1 | No. | 5,000 ₹5,000 | 5,100 ₹5,100 | 5,500 ₹5,500 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
17 Feb 2026, 1:00 pmClosed
SE EDC-I BSR
SE EDC-I HYDEL COLONY BULANDSHAHR
Work of issuing 1293 KW electricity connection to Kalyan Singh Medical College under the full deposit scheme.
2026_PVVNL_1115060_1
T - 73/2025-26
Open Tender
Electrical Works
30 days
BULANDSHAHR
PLZ REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,180
SE EDC-I
₹2,000
1 Apr 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
fo|qr uxjh; forj.k [k.M&cqyUn'kgj ds vUrxZr iw.kZ tek ;kstuk en esa 33@11 ds0oh0 fo|qr midsUnz oyhiqjk ds dk;Z{ks= esa dY;k.k flag eSfMdy dkyst] dks 1293 fd0ok0 dk fo|qr la;kstu fuxZr djus dk dk;ZA
Carriage Of 33kv/11kv Ct/Pt Unit From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
Carriage Of 33kv/11kv Metering Cubical Set Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
Carriage Of 11 Kv Vcb Complete, From Electricity Store Center, Bsr To Site Of Work With Loading And Unloading At Both Ends On Kachha Packka Road, As Per Direction Of Site Incharge (0-50 Km).
Carriage Of Xlpe Cable From Store Center To Je Sub Station/Any Other Place Including Loading And Unloading At Both End.
11 KV XLPE CABLE 3x185, 3x300 SQ MM
Laying Of 11 Kv Xlpe Cable 3x185, 3x300 Square Mm & Outer Size Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P, Carrier Etc. Requried For Proper Completion Of Work.
Open Trench Of 11 Kv Xlpe Cable 3x185/300 With Cost Of Digging, Bricks And Sand Completed In All Accessories.
Making/Filling Of 11 Kv Cable Jointing Kit/Straight Through Of Various Size Xlpe Cable
Safely Installing The 33 Kv/11 Kv Ct/Pt Unit With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
Safely Installing 11kv Metering Cubical
Safely Installing of vcb With The Help Of Crane/Manual Labour At Sub-Station Double Pole/Plinth, As Per Direction Of Site Incharge.
Proper waring of 11 kv VCB & Commisioning etc.
Reparing Of 05 MVA power Transformer Plinth Including Cost Of All Material & Labour, As Per Direction Of Site Incharge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
T73PDF.pdf
Tender Documents • 1.18 MB
BOQ_2068472.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid