Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹26 L
EMD Value
₹52,000
Closing Date
23 Nov 2026, 6:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (MIS) Mhow
Garrison Engineer (Maint) Infantry School Mhow (MP) - 453441
REPAIR MAINT OF FIRE FIGHTING SYSTEM FIRE ALARM SYSTEM SMOKE DETECTORS AND OTHER ASSOCIATED WORKS IN FIRE FIGHTING SYSTEMS AT HD ENCLAVE AND REPAIR REPLACEMENT OF HEPA FILTER AND PRE FILTER FOR OT ICU AT MH MHOW AND OTHER CONNECTED WORKS UNDER GE MAI
2026_MES_784642_2
8975/GE (MIS)/Mhow
Open Tender
Civil Works - Others
Item Rate
180 days
GE (MIS) Mhow
All as per Tender document
8 documents required · 8 mandatory
₹500
GE (MIS) Mhow
₹52,000
Yes
9 Nov 2026
9 Nov 2026
25 Nov 2026
9 Nov 2026
23 Nov 2026
16 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance, inspection, checking, testing and servicing of the Fire Hydrant Pump House and complete Fire Hydrant System, including all equipment and components installed therein, such as valves, pumps, air cushion tanks, pressure switches, pressure gauges, control panels, piping, fittings and associated accessories, to ensure proper functioning and operational readiness of the entire system. The scope of work shall include the following:-
(a) Checking, inspection and servicing of pre-charged air vessels, including greasing, overhauling, tightening of nuts and bolts, checking of air pressure, leakage and associated connections, and attending to minor servicing requirements. All necessary labour, grease, lubricants and minor consumables/spares required for servicing shall be deemed included in the quoted rate. The cost of replacement of defective or damaged parts shall be measured and paid separately under the relevant items of this Schedule. The vessel shall be ensured to be in proper working condition and ready for operation.
(b) Checking, inspection, oiling and greasing, wherever required, and servicing of all types and sizes of Gate Valves, Butterfly Valves, Non-Return Valves (NRV), Check Valves, Expansion Bellows, Spring-Loaded Valves, Control Valves, Forged Brass Ball Valves, Test Assemblies and other associated valves and accessories. The work shall include removal and refixing, wherever required, for servicing purposes. Cost of replacement valves, parts and accessories shall be measured and paid separately under the relevant items of this Schedule.
(c) Checking, inspection, oiling, greasing and servicing of Fire Hydrant Landing Valves of all types and sizes, including checking of spindle, gland packing, hand wheel, coupling, outlet and sealing arrangements to ensure smooth operation and leak-proof functioning. Cost of replacement parts shall be measured and paid separately under the relevant items of this Schedule. | 18 | Each Job | - | - |
| 1.01 | (d) Checking, inspection, cleaning and servicing of Hose Reel Drums, including checking of drum rotation, bearings, brackets, hose guide, nozzle, hose connections and associated fittings to ensure smooth and trouble-free operation. Necessary cleaning, lubrication and minor adjustments shall be included in the quoted rate.
(e) Checking and inspection of Rubber Reinforced Lined Fire Hoses for physical damage, cuts, cracks, leakage, deterioration, coupling condition and general serviceability. Necessary testing for leakage and operational suitability shall be carried out wherever required, as directed by the Engineer-in-Charge.
(f) Checking, inspection, testing and servicing of the Main Control Panel for Fire Fighting Pumps, including inspection of internal wiring, electrical connections, terminals, circuit breakers, MCBs, MCCBs, relays, contactors, overload protection devices, indication lamps, selector switches and other associated electrical and control components. The scope shall include attending to minor electrical faults, tightening of connections and repairing/replacing faulty cables and wires, wherever required. The cost of replacement of MCBs, MCCBs, relays, contactors, cables, wires and other electrical components shall be measured and paid separately under the relevant items of this Schedule.
Note:- (i) The contractor shall inspect and check all components covered under this item and ensure that the complete Fire Hydrant System is maintained in proper working condition and ready for operation. All activities shall be carried out by technically competent personnel having experience in the maintenance and servicing of fire-fighting installations.
(ii) The contractor shall arrange all necessary labour, tools, tackles, testing instruments, lubricants, grease, cleaning materials and other consumables required for carrying out the specified servicing work. | - | - | - | - |
| 1.02 | (iii) The quoted rate shall include all labour charges for dismantling, opening, servicing, overhauling, cleaning, lubrication, reassembly, refixing, adjustment and testing, wherever required, for the components covered under this item.
(iv) Replacement of defective or damaged parts, valves, electrical components, cables, wires and other equipment shall not be included in this item. Such replacement materials shall be measured and paid separately under the relevant items of this Schedule, subject to approval of the Engineer-in-Charge.
(v) Wherever replacement of any component is required, the contractor shall bring the same to the notice of the Engineer-in-Charge and obtain prior approval before carrying out replacement.
(vi) The contractor shall ensure that all serviced components are properly reassembled, tested and restored to their original operational condition.
(vii) Any leakage, abnormal noise, vibration, malfunctioning or other defects observed during servicing shall immediately be brought to the notice of the Engineer-in-Charge.
(viii) The contractor shall take all necessary precautions during maintenance to ensure that the Fire Hydrant System is not left in an unsafe or non-operational condition.
(ix) No separate payment shall be made for routine servicing, oiling, greasing, cleaning, tightening, minor adjustments, dismantling, refixing and testing, as these activities shall be deemed fully inclusive in the quoted rate. (x) The contractor shall submit a maintenance and inspection report indicating the condition of the equipment, defects observed, servicing undertaken and operational status of the system upon completion of the work.
(xi) The quoted rate shall be inclusive of all labour, servicing charges, tools, tackles, testing equipment, lubricants, grease, consumables and incidental expenses required for complete execution of the above work. The cost of replacement parts and materials shall be measured and paid separately under the relevant items of this Schedule. | - | - | - | - |
| 2 | M&L for disconnecting the existing Jockey Pump Set of 15 HP capacity, of any make and model, from the electric motor, suction and delivery water connections, electrical connections and associated accessories, including dismantling and removing the pump set from its existing foundation and safely transporting the same to the respective Original Pump Manufacturer's Authorised Service Dealer workshop for complete inspection, stripping, opening, overhauling, repairing and replacement. The work shall include identification and replacement of all defective, worn-out or unserviceable parts, reassembling of the complete pumping set, oiling, greasing, replacement of necessary nuts, bolts, gaskets, seals and other accessories, and carrying out all necessary repairs to restore the pump to its original working condition. The repaired pump set shall thereafter be transported back to the site, re-installed and properly aligned on its original foundation, reconnected with the motor, suction and delivery pipelines, electrical connections and all associated accessories, including commissioning, testing and trial operation to ensure smooth, efficient and noise-free operation, complete in all respects as specified and as directed by the Engineer-in-Charge:- | 3 | Each Job | - | - |
| 2.01 | (i) The quoted rate shall be inclusive of the cost of supply, replacement and fitting of all the following parts, wherever required, irrespective of their make, model or condition:-
Ball Bearings, Pump Shaft, Impeller, Bush, Gland Plate, Stuffing Box Packing, Cooling Tube with Banjo Nut,
O-Rings, Shoulder Rings, Gasket Packing, Vent Valve,Gland Rope, Complete Set of Rubber Oil Seals,
Nuts, Bolts, Washers and other necessary fastening accessories. Any other minor spares and consumables required for complete repair and satisfactory functioning of the pump set. No extra payment whatsoever shall be admissible for the above replacement parts, their supply, fitting, installation or associated labour, as the same shall be deemed fully inclusive in the quoted rate.
(ii) All necessary tools, plants, tackles, lifting arrangements, loading/unloading equipment and vehicles required for dismantling, lifting, shifting, transportation to and from the Original Pump Manufacturer's Authorised Service Dealer workshop and re-installation at site shall be arranged by the contractor at his own cost. No additional payment shall be admissible on this account.
(iii) The repair and overhauling work shall be carried out at the respective Original Pump Manufacturer's Authorised Service Dealer workshop by technically qualified and experienced personnel. The contractor shall ensure that genuine and compatible replacement parts are used.
(iv) The contractor shall ensure proper alignment, levelling, grouting/refixing wherever required, reconnection of all suction and delivery pipelines, electrical connections and accessories, and complete commissioning of the pump set at its original location. | - | - | - | - |
| 2.02 | (v) After completion of repairs and re-installation, the pump set shall be tested under actual operating conditions to verify smooth running, proper discharge and pressure, absence of abnormal vibration, overheating, leakage and unusual noise. Any defects observed during testing shall be rectified by the contractor at no extra cost.
(vi) The contractor shall submit a repair and servicing report, including details of replaced parts and workshop testing/inspection records, wherever available, to the Engineer-in-Charge after completion of the work.
(vii) The quoted rate shall be deemed inclusive of all dismantling, transportation, workshop inspection, stripping, repairs, overhauling, replacement of specified parts, reassembling, oiling, greasing, refixing, alignment, commissioning, testing, labour, tools, tackles, vehicles and all incidental expenses required to complete the work.
(viii) No separate payment shall be made for any of the activities, replacement parts, consumables, transportation or incidental works specified above. | - | - | - | - |
| 3 | S&F Fire Hose Box made of 18 Gauge MS Sheet, having overall dimensions of 800 mm × 600 mm × 250 mm, with double front doors fitted with 4 mm thick glass panels and door frames made of 16 Gauge MS Sheet, of fully welded construction, with hinged double front doors and suitable locking arrangement. The box shall be weatherproof, duly painted externally in Fire Red colour and internally in Brilliant White colour. External surfaces shall be painted with two coats of synthetic enamel Post Office Red paint over one coat of red oxide zinc chromate primer. The words "FIRE HOSE BOX" shall be prominently written on the front of the box. The box shall be suitable for housing 2 Nos. of 15-metre lengths of canvas fire hose with couplings, 1 No. branch pipe, 1 No. fireman's axe, 1 No. first aid fire hose reel and 1 No. hydrant outlet. The work shall also include dismantling and removal of the existing hose box, including loading, unloading, transportation, handling, positioning, alignment and fixing of the new hose box at the existing location, complete in all respects as specified and as directed by the Engineer-in-Charge.
Note: (i) The contractor shall carefully dismantle and remove the existing Fire Hose Box without damaging the adjoining structure, firefighting pipelines or fittings, (ii) The contractor shall verify the existing dimensions and fixing arrangements before installation of the new hose box, (iii) The new hose box shall be properly aligned, levelled and securely fixed at the existing location using suitable fasteners and accessories, (iv) All necessary labour, tools, tackles, transportation, loading, unloading and fixing arrangements shall be included in the quoted rate, (v) Any damage caused to existing structures or installations during dismantling and fixing shall be made good by the contractor at no extra cost, (vi) The completed installation shall be inspected and approved by the Engineer-in-Charge. | 20 | Each Job | - | - |
| 4 | S&F in replacement of standard short Gunmetal Branch Pipe fitted with Gunmetal Nozzle having 16 mm dia outlet and standard 63 mm dia male instantaneous spring-lock type coupling, conforming to IS: 903-1986. The Branch Pipe and Nozzle shall be ISI marked and complete in all respects, including dismantling and removal of the existing defective branch pipe, supplying, fixing and connecting the new branch pipe at the existing location, as specified and as directed by the Engineer-in-Charge. | 25 | Each | - | - |
| 5 | S&F in replacement of standard Fireman's Axe with heavy-duty insulated rubber handle, 11-inch size, complete in all respects, including removal of the existing defective/unserviceable Fireman's Axe and supplying and placing the new Fireman's Axe in the existing Fire Hose Box, as specified and as directed by the Engineer-in-Charge. | 25 | Each | - | - |
| 6 | S&F in replacement of Yard Hydrant Post / Stand Post of 80 mm dia, made of GI/MS pipe, 1.5 metre height, flanged at both ends, including dismantling and removal of the existing defective/unserviceable hydrant post, supplying, fixing, aligning and connecting the new hydrant post with the existing firefighting pipeline, complete with necessary flanges, nuts, bolts, gaskets and accessories, as specified and as directed by the Engineer-in-Charge. | 7 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_895240.xls
BOQ • 0.33 MB
Tenderandspecialcondition8975.pdf
Tender Documents • 0.56 MB
PS8975.pdf
Tender Documents • 0.23 MB
ListOfMake8975.pdf
Tender Documents • 0.23 MB
DetailsOfWorkInAndInHand.pdf
Additional Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .