| 1 | L1₹12.6 LAccepted-AOC AT PO SINDURPANK PS SADAR DIST SAMBALPUR PIN 768005 | SAMBALPUR | ODISHA | 768005 | ₹12.6 L | L1 | Accepted-AOC Selected as winner through transparent lottery system. |
| 2 | L1₹12.6 LRejected-AOC AT PO JUNA DIST KENDRAPARA 754213 | JUNA | KENDRAPARA | ODISHA | 754213 | ₹12.6 L | L1 | Rejected-AOC Not selected. |
| 3 | L1₹12.6 LRejected-AOC | ₹12.6 L | L1 | Rejected-AOC Not selected. |
| 4 | L1₹12.6 LRejected-AOC AT PO TALAB PS SASON DIST SAMBALPUR PIN 768200 | SAMBALPUR | ODISHA | 768200 | ₹12.6 L | L1 | Rejected-AOC Not selected. |
| 5 | L1₹12.6 LRejected-AOC SAMBALPUR IRRIGATION DIVISION SAMBALPUR | JAGATSINGHAPUR | ODISHA | 754102 | ₹12.6 L | L1 | Rejected-AOC Not selected. |
Tender Value
₹12.6 L
EMD Value
₹12,488
Closing Date
8 May 2026, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Sambalpur Irrigation Division, Sambalpur
Construction of VRB at RD 874m of Kabarapali Minor of Huma Tail Distributary for 2026-27.
2026_CEBBU_128589_1
SESID-02(17)/2026-27
Open Tender
Civil Works - Roads
60 days
Sambalpur
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹12,488
Yes
25 Jun 2026
29 Apr 2026
11 May 2026
29 Apr 2026
8 May 2026
29 Apr 2026
29 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing R.C.C. slab & pier including stacking the useful materials for reuse and removing the debris within 50m lead etc. with all labour charges, T&P, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | Cum | 1,697 | - |
Earth work in excavation of foundation in hard soil or gravelly soil with all lead ,lifts and delifts including dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m depth including cost of all labour ,materials & T&P etc.Complete as directed by the Engineer-in-charge.of Engineer-in-charge. | 1 | Cum | 276.9 | ₹276.62 | |
Filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty etc. complete as per direction of the Engineer-in-Charge. | - | Cum | 990 | - | |
Cement concrete (1:3:6) with 4cm size hard granite metal including all leads, lifts & delifts including cost, conveyance, royalty & taxes etc. of all materials, all labour charges, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | Cum | 5,864.8 | - | |
Cement concrete (1:2:4) with 12mm size hard broken granite chips including with all leads, lifts & delifts including cost, conveyance, royalty & taxes etc. of all materials, all labour charges, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. | - | Cum | 7,526.1 | - | |
Supplying, fitting and placing uncoated HYSD Bar reinforcement complete as per drawing and technical specification including cost, conveyance, taxes of all materials and cost of all labours etc. complete as per direction of Engineer-in-charge. | - | Qntl | 9,277.2 | - | |
Rigid and smooth centering and shuttering for PCC walls including false works and dismantling them after casting including cost of materials for RCC foundation, Plinth band & footing base of column mass concrete etc. complete as per direction of Engineer-in-Charge. | - | Sqm | 248.7 | - | |
Providing formwork for Concrete with F1 finish for upstream faces of dam,spillway ,glacis of barrages,unexposed surfaces of foundation .block joints etc.with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materials and T & P etc.Complete as directed by the Engineer-in-charge. where necessary complete with all labour,materials and T & P etc. Complete as directed by the Engineer-in-charge. | 1 | Sqm | 620.3 | ₹619.68 | |
RCC work of M-20 grade(1:1½:3) with 20mm and down grade hard broken granite stone chips including hoisting and laying with all leads, lifts & delifts including cost, conveyance, royalty & taxes etc. of all materials, all labour charges, T&P, watering & curing, B&O.C. Workers Welfare Cess etc. complete as directed by the Engineer-in-charge. (vide item No.04, P- 50 of A.R. 2006) Data for 15 Cum | 1 | Cum | 6,022.7 | ₹6,016.68 | |
Filling in foundation and plinth with excavatedearth including watering and ramming etc. complete as directed by the Engineer-in-charge. | 1 | Cum | 153.8 | ₹153.65 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589082.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_589082.xls
BOQ • 0.27 MB
BID_17.pdf
Tender Documents • 4.91 MB
Download all tender documents and submit your bid