Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.3 LAccepted-AOC 12 MANAULI HOUSE AMBALA CITY 134003 HRY | AMBALA CITY | AMBALA | HARYANA | 134003 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹68.0 L+₹17.2 L (33.8%)Rejected-AOC 186 GANDHI MARKET AMBALA CANTT 133001 | AMBALA CANTT | AMBALA | HARYANA | 133001 | L2 | Rejected-AOC L2 Bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical Not enlisted in appropriate cat d(iv) | |
| 4 | Rejected-Technical 275 2 AJIT NAGAR UPPER GADIGARH AIR PORT ROAD JAMMU INDEX NO D 04 ADGNJ | JAMMU | JAMMU AND KASHMIR | 180001 | - | Rejected-Technical Not enlisted in appropriate cat b(i) and d(iv) | |
| 5 | Rejected-Technical H NO 177 GOVINDPURA SATWARI JAMMU CANTT 180003 J K | JAMMU | JAMMU AND KASHMIR | 180003 | - | Rejected-Technical Not enlisted in appropriate cat b(i) and d(iv) |
Tender Value
Refer Docs
EMD Value
₹99,400
Closing Date
21 Sept 2021, 6:00 pmClosed
GE I RND Delhi
MILITARY ENGINEER SERVICES, GARRISON ENGINEER (I) RND, LUCKNOW ROAD, TIMARPUR, DELHI-110054
REPAIR/MAINTENANCE OF METERING AND PROTECTION SYSTEM FOR HT/LT PANEL INCLUDING DG AMF FOR REAL TIME MONITORING AND ALLIED WORKS IN RESPECT OF ENERGY AUDIT AT KWC AREA UNDER GE I RND DELHI
2021_MES_470162_1
GE/RND-50/DLI/2021-2022
Open Tender
Civil Works
Item Rate
180 days
Delhi
Class -D, cat- b(i) and d(iv)
2 documents required · 2 mandatory
₹500
GE I RND Delhi
₹99,400
Yes
13 Oct 2021
24 Aug 2021
23 Sept 2021
24 Aug 2021
21 Sept 2021
9 Sept 2021
Amount
o RF Output power Levels o Max : 33dbm (+/-) 2db o Receiver sensitivity : < -106 dbm o Avg power consumption(sending data every 1 minute) : < 1 W o Voltage range : 70V to 300V single phase SMPS o Normal operation temperature: -20 °C to +55 °C o bands : quad band o ports : RS485, RS232 (b) CE Certified GPRS/ Edge Modem o Dual-Band GSM/GPRS 900/ 1800 MHz o 3.3V & 5V interface for direct communication with MCU kit o Configurable baud rate o SMA connector with GSMAntenna. o SIMCard holder. o Built in Network Status LED o Inbuilt Powerful TCP/IP protocol stack for internet data transfer over GPRS. o GPRS mobile station class B o Compliant to GSM phase 2/2+ – Class 4 (2W@ 900 MHz) – Class 1 (1W@ 1800MHz) o Control via AT commands (GSM07.07 ,07.05 and SIMCOMenhanced AT Commands) (c) Micro-Controller o Type - MSP430 5F4194 o Hardware Multiplier Supporting 32-Bit Operations o Serial Onboard Programming, No External Programming Voltage Needed o Three-Channel Internal DMA o Basic TimerWith Real-Time Clock Feature o 12-Bit Analog-to-Digital Converter (ADC) o Up to Four Universal Serial Communication Interfaces o Unified Clock System
o Flexible Power Management System o 16-Bit RISC Architecture o Wake Up From Standby Mode in 3.5 μs (Typical) o Ultralow-Power Consumption (d) SPI Flash o Type -WinbondW25Q16DV : 16M bit / 2M-byte (2,097,152) o Programmable page - 256 byte per page o Type - Standard SPI: CLK/CS,DI,DO/WP/Hold (e) Specifications for data o GPRS class 10: max. 85.6 kbps (downlink) o PBCCH support o Coding schemes CS 1, 2, 3, 4 o CSD up to 14.4 kbps o USSD o Non transparent mode o PPP-stack (f) Interface o Interface to external SIM3V/ 1.8V o Analog audio interface o RTC backup o SPI interface (option) o Serial interface o Antenna pad o I2C o GPIO o PWM o ADC (g) Special Firm ware o FOTA o MMS
• Define group of IEMUs meters based on locations • Define the reports on Cumulative kWh, and Running Hours, etc. • Define Reports on the basis of Quality of Power supply like Voltage imbalance, Current imbalance, Voltage fluctuations etc. Alarms and Alerts: The Web Based Application Software and Services should generate Alarms and send Alerts over SMS messages to mobile users and emails for the conditions, such as: • Voltage in any phase goes above 11800 V with value of voltage • Voltage in any phase goes below 9000V with value of voltage • Power factor of any phase is less than 0.85 with value of power factor • Any deviation from benchmark value of active power, apparent power and reactive power. • Incoming power supply not available. • Ability to suppress the alerts during specified time period in a day. Note: SMS to User should be strictly through Central Server (CS) and No User shall be able to receive SMS directly from the Intelligent Field Device due to security concerns. SMS must be delivered to client up to 05 Years from date of instalation Key Technology Criteria: • The System should be accessible anywhere through web but with a secured password protection and no software or hardware required to be installed for viewing the data on web • The software and server should be maintained by the contractor, without cost implication, and there should not be any requirement of deploying IT hardware and software. • The web application shall be hosted on Tier-III certified data center complete all as specified & directed
Dismantling of old unserviceable and Supply, installation, testing and commessioning of accurate power factor correction cum protection device 3 phase 4 wire 08 steps TO 12 steps as per site Protection against power factor of the electrical system close to unity Protection at power failure to Close the capacitor bank and should not and due to sudden variation in the load the power factor shoots above unity Auto shut down panel or switching off extra Capacitors in Delta Mode factor condition. be re-energized till it discharges to a safe value of 50 volts or less, relay should be instantaneous type with low voltage setting Spikes/Surge protection to trip the capacitor bank at overloading due to over voltage or harmonic current. over current relay tripping protection of the bank against system disturbances and faults protection of the bank against faults occurring within the bank including protection of the bank against faults occurring within the bank Timer for re-energisation after 5 minutes: protection to block the re-switching of capacitor bank in less than 5 minutes. including with following specifications 3 phase 4 wire 3 Current Transformers resin cast 15 VA burden 1100 volts insulation FUNCTION Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for exsisting APFC Panels , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection. ALSO SPECIAL ZERO CROSSING SWITCHING OPERATION PROTECTION SYSTEM DIGITAL DISPLAY OF LINE PHASE VOLTAGES AND LINE CURRENT INCLUDING FREQUENCY Phase Un balance (1 to 20%) (Adjustable) Power consumption 15VA / 3W Setting Accuracy voltage ± 4V, Minimum setting current 0.5A, Maximum setting currrent =5A (Above 5A - external CT setting max.1000/5 in steps of 5), Setting Accuracy Current ± 5% of full scale ±1digit, Trip time delay1 to 250secs settable for UnBalance, OverVoltage, UnderVoltage ( Line to Line & Line to Neutral ) , UnderCurrent & OverCurrent, Trip time accuracy± 1% of set delay ±2sec., Trip setting, Phase failure 3 sec Max. factory set., Phase Reversal Auto tripping, Phase Un balance1 to 20% (Adjustable), Under Voltage and over voltage 5V to 60V AC (Adjustable Individually ), Recovery Time2 sec Min Power On Delay10 sec Max., Service life(under no load) 10Lakh operations minimum , Electrical life, (under full load) 10 Lakh operations minimum PROTECTION SYSTEM SHOULD BE PROVIDED WITH EACH FAULT DIGITAL DISPLAY, Compensation of each phase, Measure power factor , total watts, total VAr, total KWH, Total KVArh, Programmable THD protection, Programmable Discharge Time complete all as specified & directed.
Dismantling of old existing mechanical /Electrical cum electronic unserviceable unit up to 320 KVA Load and supply, installation, testing and commissioning of protection device 3 phase 4 wire complete including replacement of the 02 Numbers DC contactor 25 Amps operating voltage 12/ 24 volts DC also comprising automatic battery charger 12 volt/24 volt 15 amps with auto cut off at 13.2/ 27 volts including delivering uninterrupted 220 volts AC 100 watts Automation with restoration of electric supply within 30 seconds (i) If the mains fail, or one or more phase of mains is not available. If any phase voltage of mains is out of present limits however there should be a provision to set the limits of higher and lower phase voltages as per the site requirement. The mains supply with in this range shall be considered as healthy so as to avoid continuous running of Engine Alternator Set. Switch the load to the engine supply after suitable time delay, after starting the engine on mains failure/phase failure / low voltage / high voltage. Switch the load back to the mains supply after suitable time delay, when healthy mains supply is restored and stopping the Engine. Attempt to start the Engine up to three times on failure of earlier attempts with suitable time intervals. Two level fuel sensor for fuel should be provided at 50% & 25% respectively, with automatic temperature controller built with 6 inch cooling fans with proper installation at LT panel as directed by Engr-in-Charge provide following settable features: - (a) Mains failure time - to initiate automatic EA start after 0 to 300 seconds of mains failure. (b) Mains restore time - to initiate automatic stop of EA after 0 to 300 seconds of mains in stable conditions. (c) Low oil pressure delay time - 0 to 99 seconds delay of the low-pressure oil input alarm from engine start. (d) Stop solenoid time - 10 to 99 seconds enabling time for "stop solenoid". (e) Cranking up time - 0 to 99 seconds enabling time for starter. The timer is reset if the engine starts before the programmed time. (f) Start attempts - 1 to 3 numbers of automatic attempts during automatic start cycle (g) Attempts interval - 1 to 99 seconds time interval between starting pulse attempts. (h) Cooling down time - 0 to 300 seconds engine cooling time before stopping. During this time the engine runs without load. (i) Generator voltage time - time of stable generator voltage to close EA contactor to load (0 to 300 seconds). Multifunctional meter to indicate Voltage, Current, PF, Frequency & kWh of DG Set. including SAFETY CONTROL. Stop fault. Start fault 8. Engine Temperature high. Alternator fault. BTS battery low. Mains ok / mains faulty Overload. Over / under voltage Under /Over Frequency also including S/I/T/C of 02 Numbers one for input and second for output load 3 phase 4 wire 03 Current Transformers resin cast 15 VA burden 1100 volts insulation FUNCTION Limit the Inrush Current, Improve the THD/PF at Light Load or High Line, Improved Stability with a Type 2 Compensation Network--Phase Unbalance, Auto Phase Reversal tripping suitable for suitable load as per site requirement , Phase Missing Under Voltage and Over Voltage Monitor and Control, Neutral Open Protection complete all as specified & directed.
. This includes installation in complete respects as per specifications mentioned below :- (a) Processor 32 bit (b) On Board Memory Integrated non-volatile memory capacity not less than 1 MB (c) Time Synchronization Simple Network time Protocol ( SNTP) (d) Internal Watchdog (e) Reset Switch (f) Clock Internal RTC (g) Redundant Power Supply with diode Oaring (h) Diagnostic LEDs (i) Firmware upgrades through network (j) Web-Browser (k) Input/output as per required (l) Communication Ports 2 x Modbus RS485 ( ≤ 19 200 bit/s ),and 1 x Modbus TCP/IP (10/100 MBit/s). Communication ports should be optically isolated It shall be possible to increase the number of communication Ports in the RTU/PLC by addition of cards, if required in future. RTU connection to Sever with Industrial grade Local Area Network with Ethernet switch 24/16 ports (10/100 Base TX) Make of RTU/DI module/DO Module/AI Module :- ABB/Schneider/Siemens or ISO 9001 :2015 CERTIFIED (m) Supply and fixing Contact multiple relay suitable for operation with digital input and output module of RTU of Make : ABB/Schneider/Siemens (n) One Spare PLC/RTU will consider as standby mode. (o) 10" HMI Touch screen to be considered in cause of Server PC failure.(User can monitor and control the system from 10" Touch Screen with Graphics) (g) Facility to define certain alarms with audible sound to attract the attention of the operator as per user requirement for DG control, breaker control, tripping and malfunctioning of breaker etc (h) SQL data base (i) Asset Management in single screen display as user requirement. (j) System should support adding more parameters in future with minimal changes. programming with existing MFM to detect changes in processes and send them to the central hub, along with RTUs and PLC collect & compile data supplied by MFM, preparing it for display and analysis by the human–machine interface delivering programmed output to microprocessors to convert data collected from sensors into usable data for the central hub with PLCs operation allowing users to interface directly with sensors and make changes without affecting the entire system. Complete HMI devices are master units that allow to supervise the data acquisition process. Serving as the system’s central processor, the HMI also allows users to regulate and modify the system as needed with add on features allowing to use HMIs to interact with the gathered data through graphical user interfaces, usually computer monitors, and compile reports for later use. Network connectivity (field buses, protocols, etc.) This automation includes DG operation & voltage or VAR control and DG automatic switching. DG voltage control performs voltage regulation and capacitor placement operations to existing APFC are programmed at site while feeder switching deals with remote switching of various feeders, detection of faults, identifying fault location, isolating operation and restoration of service. In this system, the architecture continuously checks the faults and their location by using wireless fault detector units deployed at various outgoing stations. In addition, it facilitates the remote circuit switching and historical data collection of feeder parameters and their status. different DG must be automated with modular and integrated devices in order to decrease the number and duration of outages. Remote-Control Units (RTUs) maintenance and operational duties such as remote load switching, capacitor bank insertion and voltage regulation. The entire network is connected with a communication medium in order to facilitate remote energy management at the central monitoring station.
Note for item No 1.00 to 6.00 :- (i) The entire work shall be executed by OEM only approved by Accepting Officer. (ii) The contractor shall be submitted original purchase vouchers, test certificate and guarantee certificate from OEM for scrutinized/approval of GE(I)/Engr-in-Charge before execution/installation of item at site. (iii) The contractor shall also be furnished written guarantee on his letter pad to the GE(I) after completion of work. The contractor shall also be ensured post audit of work from MES enlisted Energy Auditor and completion of work will only be issued after above audit. (iv) The rates for the above requirements shall also deemed to be included in the quoted rates and no extra claim will be entertained.
M/S Sonu Traders
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .