Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹21,894
Closing Date
30 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
RM, Uttar Dinajpur Region, WBSEDCL
Uttar Dinajpur Regional Office, WBSEDCL, Mohanbati, Raiganj
Construction of 1 no PTR foundation, 1 no VCB and CT Plinths, cable box structure, dismantling of old structures, construction of cable trench, switchyard concreting and Electrical erection works at Panjipara 33/11 KV substation (2nd call)
2026_WBSED_1043868_1
RM/UDRO/C-E/ETENDER/2026-27/02 dated 29.9.26
Open Tender
CIVIL AND ELECTRICAL WORKS
Percentage
90 days
Panjipara 33/11 KV substation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,894
6 Oct 2026
6 Oct 2026
4 Nov 2026
7 Oct 2026
30 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of plain cement concrete works, stacking servicable materials at site and removing rubbish as directed within a lead of 75m. Ground floor including roof, upto 150 mm. thick | 20 | Cum | 948.39 | ₹18,967.8 |
| 2 | Dismantling R.C. floor, roof, beams etc. including cuting rods and removing rubbish as directed within a lead of 75m including stacking of steel bars. Ground floor including roof | 5 | Cum | 1,975.56 | ₹9,877.8 |
| 3 | Dismantling all types of masonry excepting plain cement concrete reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m. In ground floor including roof. | 5 | Cum | 451.47 | ₹2,257.35 |
| 4 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 50 | Cum | 168.67 | ₹8,433.5 |
| 5 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | 500 | Sqm. | 11.11 | ₹5,555 |
| 6 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation not exceeding 1,500 mm. | 20 | Cum | 120.46 | ₹2,409.2 |
| 7 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 20 | Cum | 194.3 | ₹3,886 |
| 8 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)With earth obtained from excavation of foundation. | 20 | Cum | 78.31 | ₹1,566.2 |
| 9 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made onmeasurement of finished quantity) | 10 | Cum | 492.28 | ₹4,922.8 |
| 10 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. | 15 | Sqm | 327.24 | ₹4,908.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
BOQ_2560920.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .