| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.1 CrAccepted-AOC | ₹8.1 Cr | L-1 | Accepted-AOC Being the first lowest bidder hence accepted |
| 2 | L-2₹9.0 Cr+₹96.6 L (12.0%)Rejected-Finance | ₹9.0 Cr+₹96.6 L (12.0%) | L-2 | Rejected-Finance Being the second lowest bidder hence rejected |
| 3 | L-3₹9.5 Cr+₹1.4 Cr (17.4%)Rejected-Finance | ₹9.5 Cr+₹1.4 Cr (17.4%) | L-3 | Rejected-Finance Being the third lowest bidder hence rejected |
| 4 | L-4₹10.0 Cr+₹1.9 Cr (23.6%)Rejected-Finance | ₹10.0 Cr+₹1.9 Cr (23.6%) | L-4 | Rejected-Finance Being the fourth lowest bidder hence rejected |
| 5 | L-5₹10.7 Cr+₹2.7 Cr (33.0%)Rejected-Finance | ₹10.7 Cr+₹2.7 Cr (33.0%) | L-5 | Rejected-Finance Being the fifth lowest bidder hence rejected |
Tender Value
₹11.1 Cr
EMD Value
₹21.1 L
Closing Date
11 Feb 2025, 4:00 pmClosed
Executive Engineer
HIMUDA Division Jarja Nahan distt sirmour hp 173001
Housing Colony at Sheel Near Solan Distt Solan HP SH Construction of 16 Nos Cat II 2BHK Flats with Parking and Attic Floors in 2 Blocks Block No 1 and 2 Including internal Water Supply and sanitary Installation
2025_HIMUD_98476_1
HIMUDA ND CB E-TENDER2024-5859-68 DT 21.01.2025
Open Tender
Civil Works
Percentage
365 days
Solan
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
Yes
₹21.1 L
Yes
SHIMLA
13 Jun 2025
22 Jan 2025
13 Feb 2025
22 Jan 2025
11 Feb 2025
22 Jan 2025
27 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic Excavator)/ Manual Means over areas (up to all depth and width as well as on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by the Engineer-in-Charge. All kinds of soil. | 8,864.23 | Per Cum | 170.9 | ₹15,14,896.91 |
| 2 | Excavating trenches of required width for pipes, cables,etc including excavation for sockets, and dressing of sides, ramming of bottoms, upto all depth, including getting out the excavated soil, and then returning the soil as required, in layers upto all depth, including onsolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil upto all leads and lifts as directed by the Engineer-in-Charge. | 128.7 | Per Cum | 328.5 | ₹42,277.95 |
| 3 | Earth work in excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (upto all width on plan), including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal of surplus excavated soils upto all leads and lifts as directed, within all lead. All kinds of soil. | 928.15 | Per Cum | 242.45 | ₹2,25,029.97 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding in all depth/ in width as well as all sqm on plan) including getting out and disposal of excavated earth upto all leads and lifts as directed by Engineer-incharge., when required into plinths, sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing off all surplus excavated earth as directed by the Engineer-in- charge. Ordinary rock. | 40.78 | Per Cum | 326.7 | ₹13,322.83 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including carriage of material in all leads & lifts. | 63.1 | Per Cum | 2,343.55 | ₹1,47,878.01 |
| 6 | Stone soling properly handpacked filling interstices with Kharanja stone and consolidating with hand ramming to the required level including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100 mm spread thickness (finished work including materials and labour)including carriage of material in all leads & lifts. | 209.56 | Per Cum | 1,193.5 | ₹2,50,109.86 |
| 7Centering and shuttering including strutting, propping etc. and removal of form including carriage of material in all leads and lifts. | |||||
| 7.01 | Foundations, footings, bases of columns,etc. for mass concrete | 295.82 | Per Sqm | 251.65 | ₹74,443.1 |
| 7.02 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 3,237.87 | Per Sqm | 527 | ₹17,06,357.49 |
| 7.03 | Suspended floors, roofs, landings, balconies and access platform | 2,007.32 | Per Sqm | 608.45 | ₹12,21,353.85 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT.pdf
NIT • 1.91 MB
BOQ_144758.xls
BOQ • 0.42 MB
161427423.pdf
Tender Documents • 1.93 MB
161427425.html
Tender Documents • 0.06 MB
162025341.pdf
Tender Documents • 0.26 MB
Form6and7oblique8.pdf
Tender Documents • 2.72 MB
UNDERTAKING.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .