Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC 1627 SECTOR 26 PANCHKULA | ₹20.9 L | L1 | Accepted-AOC Lowest 1 |
| 2 | L2₹23.9 L+₹3.0 L (14.4%)Rejected-Finance 21 SECTOR 15 PANCHKULA | ₹23.9 L+₹3.0 L (14.4%) | L2 | Rejected-Finance The rates quoted by the agency on higher side |
| 3 | L3₹24.2 L+₹3.4 L (16.1%)Rejected-Finance 2593 1 SECTOR 49 C CHANDIGARH | ₹24.2 L+₹3.4 L (16.1%) | L3 | Rejected-Finance The rates quoted by the agency on higher side |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as per approved DNIT Criteria |
Tender Value
₹31.9 L
EMD Value
₹63,731
Closing Date
1 Jun 2026, 2:00 pmClosed
E.E.C.P.-1
Executive Engineer, C.P. Division No.1, 4th Floor, Deluxe Building Sec 9, Chandigarh
PROVIDING AND FIXING OF GAZEBO AND CHEQUERED TILE IN PATHWAY AND OTHER MINOR ALLIED WORK IN KURUKSHETRA HOSTEL, PEC SECTOR 12, CHANDIGARH.
2026_CHD_92660_1
CP1/2026/2822156
Open Tender
Civil Works - Buildings
Percentage
60 days
Chandigarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹63,731
16 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
1 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | |||||
| 1.01 | All kinds of soil (DSR 2.1.1) | 447.84 | Sqm | 126.34 | ₹56,580.11 |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.01 | 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) (DSR 4.1.10) | 89.59 | Cum | 6,342.6 | ₹5,68,233.53 |
| 3 | Making plinth protection 50 mm thick of cement concrete 1 :3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources :6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including
necessary excavation, levelling & dressing & finishing the top smooth. (DSR 4.17) | 39.38 | Sqm | 729.07 | ₹28,710.78 |
| 4Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: | |||||
| 4.01 | Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR 6.1.1) | 28.31 | Cum | 7,171.64 | ₹2,03,029.13 |
| 5Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size,approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. | |||||
| 5.01 | Granite stone slab colour black, Cherry/Ruby red | - | - | - | - |
| 5.02 | Area of slab over 0.50 sqm (DSR 8.2.2.2) | 104.73 | sqm | 4,997.62 | ₹5,23,400.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.36 MB
BOQ_113399.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .