| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.1 CrAdmitted-Finance | -4.01% | ₹6.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹6.3 CrAdmitted-Finance | -0.25% | ₹6.3 Cr | L2 | Admitted-Finance |
Tender Value
₹6.4 Cr
EMD Value
₹12.8 L
Closing Date
5 May 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer, Construction Division Kanpur-02, UP Awas Evam Vikas Parishad, Hanspuram, Kanpur
Construction of Gramin Stadium at Bausar Block Sarsaul Tehsil Narval District Kanpur Nagar
2026_UPHDB_1133719_1
562/SE-Kanpur/TQ-General/06 dt. 02.04.2026
Open Tender
Civil Works
360 days
Bausar Block Sarsaul Tehsil Narval District Kanpur
Construction of Gramin Stadium at Bausar Block Sarsaul Tehsil Narval District Kanpur Nagar
4 documents required · 4 mandatory
₹8,850
Executive Engineer CDKnp-02 UPAVP Kanpur
₹12.8 L
Yes
Executive Engineer, Construction Division Kanpur-0
7 May 2026
6 Apr 2026
5 May 2026
6 Apr 2026
5 May 2026
6 Apr 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | - | CUM | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5 m, as directed by Engineer-incharge.
In all kind of soil upto 1.5m depth | - | Cum | - | - |
| 3 | Same as above item no. 02 but In all kind of soil upto 1.5m to 3.0m. depth | - | Cum | - | - |
| 4 | Same as above item no. 02 but In all kind of soil upto 3.0m to 4.5m. depth | - | Cum | - | - |
| 5 | Excavating trenches by mechinical / manual means of required width for pipes cables etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth including getting out the excavated soil , and then returning the soil as required , in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed , within a lead of 50 m. All kind of soil Pipes, cables etc. exceeding 80 mm dia . But not exceeding 300mm dia. | 36 | Metre | - | - |
| 6 | Excavating, supplying and filling of local earth (including cost of local earth) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | CUM | - | - |
| 7 | Providing and laying in position ready mixed or site batched design mix cementconcrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Concrete of M10 grade with minimum cement content of 220 kg /cum | - | CUM | - | - |
| 8 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | CUM | - | - |
| 9 | Treatment of soil under existing floors using chemical emul sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | - | SQM | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
R.C.C. Work in Plinth band, Footing and Column | - | CUM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
financialbidnarwal.pdf
Tender Documents • 0.34 MB
TechnicalBidNarwal.pdf
Tender Documents • 24.20 MB
BOQ_2116272.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid