Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹12.6 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.6 LSame as L1Rejected-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹12.6 LSame as L1 | L2 | Rejected-Finance L2 |
| 3 | L3₹12.8 L+₹25,381.69 (2.02%)Rejected-Finance GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹12.8 L+₹25,381.69 (2.02%) | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹25,136
Closing Date
27 Jun 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward No 80 raptinagar me radheshyam yadav ke makan se Dr kavita sinha tak CC sadak V nali avn side patri interlocking ka karya.
2026_DOLBU_1162021_1
FFC Ward 80 sn 86
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹25,136
11 Sept 2026
19 Jun 2026
29 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). SI No.692 | 9.52 | Cum | 400 | ₹3,808 |
| 1.02 | Cleaning of site And cleaning of dismental material in all complete | 8 | Nos | 330 | ₹2,640 |
| 1.03 | Earth work in excavation in foul position soil lead 50mt.& lift 1.5 mt. incl. lab. T&P etc all complete. | 76.86 | Cum | 120 | ₹9,223.2 |
| 1.04 | P/L of base concrete in 1:6:12 with cement, L-Sand and 40mm S/B including mat. Lab. T&P,etc all complete. | 13.66 | Cum | 4,007 | ₹54,735.62 |
| 1.05 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. | 41.82 | Cum | 5,817 | ₹2,43,266.94 |
| 1.06 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 coarse sand including etc. all complete of work. | 175.56 | Sqm | 159 | ₹27,914.04 |
| 1.07 | Laying C.C in 1:2:4 for top of drain work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. | 1.6 | Cum | 8,186 | ₹13,097.6 |
| 1.08 | P/L of 125 micron polythine including etc. all complete of work. | 420 | Sqm | 24 | ₹10,080 |
| 1.09 | S/L of GSB 53-9.5mm thick S/B upto 10 cm loose layer including etc all complete of work. | 62 | Cum | 3,134.25 | ₹1,94,323.5 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.38 MB
d.pdf
Tender Documents • 2.36 MB
BOQ_2178183.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .