Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer (Central Tender Cell)
Central Tender Cell, BMC, ICOMC Tower, Unit-9, Satyanagar
Construction of large shed and flooring in front of shrine inside Sainik School Campus in Ward No. 12
2026_ORULB_142955_3
BMC-EE-Tender Cell-78/2026-27 dt. 07.10.2026
Open Tender
Civil Works - Others
Percentage
60 days
BMC, AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹12,500
Yes
Office Chamber of EE(Central Tender Cell)
10 Oct 2026
10 Oct 2026
26 Oct 2026
10 Oct 2026
26 Oct 2026
10 Oct 2026
10 Oct 2026 - 15 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead etc complete. | 1.21 | cum | 877.16 | ₹1,061.36 |
| 2 | Earth work in all kinds of soil within 50mtr mihal lead ant 1.50mer anitat it including rough creasing end levelling the bed | 5.46 | cum | 306 | ₹1,670.76 |
| 3 | Carriage of Excavated earth by mechanical means within 5 km lead including loading and unloading with all cost conveyance T & P sundries etc complete as per direction of Engineer- in-charge. | 6.67 | cum | 160.68 | ₹1,071.74 |
| 4 | Supply and filling in foundation and plinth with river sand, in layers including watering, with cost, conveyance, royalties, and taxes of all materials, cost of all labour, carriage of water, sundries T & p required for the work etc all complete as per the specification & direction of E-I-C | 1.32 | cum | 588.9 | ₹777.35 |
| 5 | PCC in prop. (1:3:6) in foundation and bed using 4 cm size h.g C.B metal of approved quality and approved quarry including hoisting, lowering, laying concrete and compacting the same to required level, with compaction, watering and curing including cost, conveyance, royalties and taxes of all materials with cost of all labours, sundries and T & p such as hire charges of concrete mixer, concrete vibrator required for the work etc complete as per the specification and direction of EI-C | 1.12 | cum | 6,209.68 | ₹6,954.84 |
| 6 | CC M-25 with 20mm size downgraded CBHG chips including all cost, conveyance, royalty and taxes etc. complete of all materials to work site as per the specificatiosn approved by the department and the directions of the Engineer-in-Charge | 2.88 | cum | 6,548.97 | ₹18,861.03 |
| 7 | Labour charges for cutting, bending, binding and tying the grill including the cost of M.S. rod. Etc Complete. | 3.45 | Qntl | 9,552.47 | ₹32,956.02 |
| 8 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismantlling them after casting including cost of materials complete in G.F. | 17.76 | sqm | 251.44 | ₹4,465.57 |
| 9 | Iron work wrought and put up in trusses and purlins and posts etc. complete. | 4,833.89 | Kg | 146.82 | ₹7,09,711.73 |
| 10 | Supplying, fitting fixing of Corrugated Iron Sheet roofing including Nut Bolts etc. Complete. | 283.26 | sqm | 701.57 | ₹1,98,726.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
DTCN_78.pdf
Tender Documents • 0.94 MB
BOQ_612983.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .