| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC | ₹15.0 L | L1 | Accepted-AOC accepted |
| 2 | L2₹15.4 L+₹39,807.85 (2.65%)Rejected-AOC | ₹15.4 L+₹39,807.85 (2.65%) | L2 | Rejected-AOC rejected |
| 3 | L3₹15.7 L+₹69,806.23 (4.65%)Rejected-AOC OFFICE NO 126 127 PLOT NO GP 185 186 SECOND FLOOR KOHINOOR MAJESTIC CHINCHWAD PUNE 19 PUNE MAHARASHTRA INDIAN 411019 | PUNE | MAHARASHTRA | 411019 | ₹15.7 L+₹69,806.23 (4.65%) | L3 | Rejected-AOC rejected |
Tender Value
₹15.0 L
EMD Value
₹14,999
Closing Date
14 Jul 2026, 5:00 pmClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction of Protection Wall to Odha at - Ainghar (G.P-Ainghar), Tal-Roha. Dist. Raigad
2026_RAIGA_1312565_1
RAIGAD/RWSS/34/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Tal-Roha. Dist. Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹14,999
12 Aug 2026
30 Jun 2026
15 Jul 2026
30 Jun 2026
14 Jul 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1, :- Excavation for foundation/pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below. stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. | 27.82 | Cum | 232.1 | ₹6,456.09 |
| 2 | Item No.2,:- Excacation for foundation/pipe trenches in by blasting in soft rock and old masonry including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering. preparing the bed for foun dation and excluding backfilling, etc, complete, etc. complete | 31.29 | Cum | 691.9 | ₹21,651.63 |
| 3 | Item No.3, Excavation for foundation / pipe trenches in hard rock by controlled blasting, including trimming and levelling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the area and liftsas below, normal dewatering, excluding backfilling, etc. com- plete, etc. complete. | 34.77 | Cum. | 914.1 | ₹31,783.26 |
| 4 | Item No.4.:- Providing and laying in situ, following grades of C.C. of trap/granite / quartzite / gneiss metal for foundation and bedding including dewatering, formwork, compacting and curing, finishing, etc. complete. M-150 | 8.24 | cum | 6,469.1 | ₹53,273.04 |
| 5 | Item No.5.:- Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant | 131.76 | cum | 7,990.4 | ₹10,52,814.73 |
| 6 | Item No.6:- Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases. newels, chajjas, lintels, pardies, copings, fins, arches, etc, as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete. (including cost of binding wire). Tor steel. | 0.89 | MT | 80,681 | ₹71,965.41 |
| 7 | Item No.7, Providing, and fixing 80 mm dia A.C./P.V.C. pipe weep holes at 1.5 M c/c staggered including cost of all materials and labour involved with all leads and lifts.etc. complete with all leads and lifts. | 10.8 | cum | 254.1 | ₹2,744.28 |
| 8 | Item No.8.:- Providing Lab Testing charges for construction materials used for Government works. a) C.C.M-15-Compressive Strength (Set of 3 Cubes) | 1 | No | 690 | ₹690 |
| 9 | Item No.9. - Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete | 1 | No | 8,554 | ₹8,554 |
| 10 | Add 18% GST | 12,49,932.81 | Amount | 0.18 | ₹2,24,987.91 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_2251163.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .