Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 11 G ASHOK PALACE 877 EAST PARK ROAD KAROL BAGH CENTRAL DELHI DELHI 110005 | CENTRAL DELHI | DELHI | 110005 | Admitted-Finance |
| 3 | Admitted-Finance 45 TRIBHUVAN ESTATE NR KATHWADA GIDC KATHWADA TA DASCROI AHMEDABAD GUJARAT 382430 | AHMADABAD | GUJARAT | 382430 | Admitted-Finance |
| 4 | Admitted-Finance PLOT NO 1201 PHASE 4 GIDC VITHAL UDHYOGNAGAR BEHIND BERGER PAINTS DISTRICT ANAND GUJARAT INDIA VITHAL UDHYOGNAGAR ANAND | Admitted-Finance |
| 5 | Admitted-Finance LIBRA ENGINEERING WORKS 16 B ARCHNA INDUSTRIAL ESTATE OPP AJIT MILLS RAKHIAL AHMEDABAD GUJARAT 380023 | AHMADABAD | GUJARAT | 380023 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
29 Apr 2025, 3:00 pmClosed
Mr Amit Borkar
thyssenkrupp Uhde India Private Limited Uhde House, L B S Marg, Vikhrol(W),Mumbai - 400083, India.
SUPPLY OF DUAL PLATE CHECK VALVE FOR AG AND UG PIPING FOR MSB, PFCC, GDS AND FF FOR NREP as per Technical Specifications for Numaligarh Refinery Limited, Assam, INDIA
2025_NRL_854427_1
TK-1ZZZA-MP-RFQ-0176
Limited
Miscellaneous Goods
Supply
210 days
Numaligarh Refinery Limited Assam, India
As per tender details
6 documents required · 6 mandatory
₹0
Exempted
16 Jul 2025
25 Mar 2025
30 Apr 2025
25 Mar 2025
29 Apr 2025
8 Apr 2025
25 Mar 2025 - 4 Apr 2025
GROUP-1 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC-CS & LTCS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE CS, 150,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VLV CS INT.COAT, 150,0, API 594, DOUBLE FLGD,B16.5,FF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, BRONZE, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VAL CS(CAUSTIC), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A216 Gr.WCB, 11, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VLV CS(NACE+H2), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., SERVICE NACE, CATEGORY 1, A216 Gr.WCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, FOR SOUR(NACE) SERVICE REQ. ACC. TO, NACE MR0103,NR-0ZZZZ-PI-SPE-0025 AND IN-043, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS (N+C), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., SERVICE NACE, CATEGORY 1, NACE+CAUSTIC, A216 Gr.WCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, FOR SOUR(NACE) SERVICE REQ. ACC. TO, NACE MR0103,NR-0ZZZZ-PI-SPE-0025 AND IN-043, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE LTCS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A352 Gr.LCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
GROUP-2 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC- AS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE AS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A217 Gr.C5, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
GROUP-3 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC- SS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE SS (H2), 600,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A351 Gr.CF8C, 17, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
Description of Work / Item(s)
Amount
GROUP-1 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC-CS & LTCS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE CS, 150,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VLV CS INT.COAT, 150,0, API 594, DOUBLE FLGD,B16.5,FF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, BRONZE, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, INTERNALLY LIQUID EPOXY COATED ACC. TO, DOC. NR-0ZZZZ-CV-SPE-0019, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VAL CS(CAUSTIC), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A216 Gr.WCB, 11, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VLV CS(NACE+H2), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., SERVICE NACE, CATEGORY 1, A216 Gr.WCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, FOR SOUR(NACE) SERVICE REQ. ACC. TO, NACE MR0103,NR-0ZZZZ-PI-SPE-0025 AND IN-043, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE CS (N+C), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., SERVICE NACE, CATEGORY 1, NACE+CAUSTIC, A216 Gr.WCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, FOR SOUR(NACE) SERVICE REQ. ACC. TO, NACE MR0103,NR-0ZZZZ-PI-SPE-0025 AND IN-043, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
DUAL PLATE CHK VALVE LTCS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A352 Gr.LCB, 12, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
GROUP-2 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC- AS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE AS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A217 Gr.C5, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
GROUP-3 (GROUP WISE EVALUATION) SUPPLY OF DUAL PLATE CHECK VALVES(MOC- SS) FOR AG+UG PIPING FOR NERP PROJECT Including TPI Charges as specified in Material Requisition.
DUAL PLATE CHK VALVE SS (H2), 600,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A351 Gr.CF8C, 17, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES
LIBRA ENGINEERING WORKS (BID ID -3208398)
advance valves pvt ltd (BID ID -3205299)
Flovel Valves Pvt Ltd (BID ID -3205404)
NITON VALVE INDUSTRIES PVT LTD (BID ID -3205009)
2L ENGINEERS (BID ID -3201759)
FLOTEK INDUSTRIES (BID ID -3202727)
NITON VALVE INDUSTRIES PVT LTD (BID ID -3205009)
2L ENGINEERS (BID ID -3201759)
Flovel Valves Pvt Ltd (BID ID -3205404)
LIBRA ENGINEERING WORKS (BID ID -3208398)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .