Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.3 LAccepted-AOC 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.6 L+₹62,855 (10.5%)Rejected-AOC 5 57 CALDWELL COLONY 1ST STREET TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | KUMAAR ENTERPRISES L2 | GAYATHRI ENGINEERING ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for changing worn-out / overhauling of 300/250/200 NB valves at ECO and APH hopper and other location including cost of welding rod, consumables and T&Ps etc.,. | 15 | Nos | 58,650 ₹69,207 | 53,850 ₹63,543 Lowest |
| 2.00 | Charges for changing worn-out /overhauling of 150/100 NB valves at ECO and other location including cost of consumables and hire charges for T&Ps., | 8 | Nos | 20,400 ₹24,072 | 18,728 ₹22,099.04 Lowest |
| 3.00 | Charges for changing valves/ Overhauling of 50/40 NB diaphragm/ ball valve in ECO, APH and BAH hopper location including cost of welding rod , T&Ps hire charges etc., | 10 | Nos | 6,700 ₹7,906 | 6,120 ₹7,221.6 Lowest |
| 4.00 | Charges for dismantling of worn-out expansion bellow, M.S sleeve and assembling of same (or) new expansion bellow and sleeve including consumables and T&Ps etc complete. | 2 | Nos | 5,800 ₹6,844 | 5,302 ₹6,256.36 Lowest |
| 5.00 | Charges for changing W/O 150NB Bend 90˚/45˚, equal Tees, Reducers in APH, ECO and BAH hopper as per site condition including cost of consumables like gas, T&P’s hire charges. | 5 | Nos | 10,200 ₹12,036 | 9,370 ₹11,056.6 Lowest |
| 6.00 | Charges for fabrication of 150 bend (90˚/45˚) equal /unequal Tee as per site condition including cost of cutting gas welding rod, consumables and hire charges for T&P etc., complete. | 5 | Nos | 15,500 ₹18,290 | 14,155 ₹16,702.9 Lowest |
| 7.00 | Charges for fabrication of 150 NB flange including cost of cutting gas, consumables and T&Ps etc complete. | 24 | Nos | 18,000 ₹21,240 | 16,608 ₹19,597.44 Lowest |
| 8.00 | Charges for dismantling and re erection of 150 NB pipe lines with proper supports including cost of cutting gas, welding rods consumables and T&Ps etc complete. | 30 | Mtr | 8,250 ₹9,735 | 7,680 ₹9,062.4 Lowest |
| 9.00 | Charges for welding of 150 NB flanges in 150NB M.S pipe, bends /spool pieces including cost of cutting gas, welding rods consumables and T&Ps etc complete. | 24 | Nos | 21,600 ₹25,488 | 19,968 ₹23,562.24 Lowest |
| 10.00 | Charges for fabrication of 250 /200 NB elbow 90˚/45˚ as per site condition including cost of cutting gas, welding rods consumables and T&Ps etc complete. | 2 | Nos | 6,200 ₹7,316 | 5,662 ₹6,681.16 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
30 Jul 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II AHP Unit V Overhauling and replacement of valves spool piece rubber expansion bellow flushing apparatus jetting nozzle etc in Unit V ECO APH BAH and chimney hoppers during annual overhaul 2025 26
2025_EB_581518_1
CE/TTPS/SE/M-II/No.134/2025-26
Open Tender
Miscellaneous Works
Item Rate
25 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹5,700
Yes
28 Oct 2025
14 Jul 2025
31 Jul 2025
14 Jul 2025
30 Jul 2025
14 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .