Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC VIRALIKATTUVILAI MEKKAMANDAPAM P O K K DISTRICT | K K DISTRICT | TAMIL NADU | ₹2.9 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | DENNISH DENSINGH L1 |
|---|---|---|---|---|
| 1.01 | Loading and unloading of 9m poles | 10 | each pole | 6,000 ₹7,080 |
| 2.01 | Excavation of 9m pole pit on normal ground | 10 | pole pit | 7,500 ₹8,850 |
| 3.01 | Erection of 9m pole on normal ground | 10 | per pole | 8,000 ₹9,440 |
| 4.01 | Transportation of 9m poles from road side to pole pit upto 2 KM | 10 | each pole | 8,000 ₹9,440 |
| 5.01 | Drilling of Slotted Holes | 28 | each pole | 11,200 ₹13,216 |
| 6.01 | Transporting of Line materials from Section office to workspot upto 20 KM . | 28 | pole pit | 14,000 ₹16,520 |
| 7.01 | Erection of V X arm 3.5 feet | 28 | per pole | 15,400 ₹18,172 |
| 8.01 | Dismantling and Refixing of V cross arm 3.5' | 28 | each pole | 16,800 ₹19,824 |
| 9.01 | Erection of tapping channel cross arm | 2 | Upto one tonne | 1,200 ₹1,416 |
| 10.01 | Fixing of HT pin insulator. | 10 | each | 6,000 ₹7,080 |
Tender Value
Refer Docs
EMD Value
₹2,975
Closing Date
2 Jan 2026, 2:00 pmClosed
EE/TKY
TNEB TKY
Elecy Imp Estimate for replacement of 7 nos deteriorated 9m psc pole into 9m psc pole in various location in 11 KV Aloor and 1 no 8m pole into 9m psc pole at kalliyankadu under parasery section Various works in various section in Eraniel c and I sec
2025_EB_634452_1
EE/D/TKY/ETW 20/Dt.19.12.2025
Open Tender
Electrical Works
90 days
EE/TKY
As specified tender
3 documents required · 3 mandatory
₹0
₹2,975
Yes
6 Mar 2026
19 Dec 2025
3 Jan 2026
20 Dec 2025
2 Jan 2026
20 Dec 2025
20 Dec 2025 - 2 Jan 2026
Loading and unloading of 9m poles
Excavation of 9m pole pit on normal ground
Erection of 9m pole on normal ground
Transportation of 9m poles from road side to pole pit upto 2 KM
Drilling of Slotted Holes
Transporting of Line materials from Section office to workspot upto 20 KM .
Erection of V X arm 3.5 feet
Dismantling and Refixing of V cross arm 3.5'
Erection of tapping channel cross arm
Fixing of HT pin insulator.
Dismantling and Refixing of HT pin insulator
Fixing of HT/LT TI fittings
Dismantling and Refixing of HT TI fittings
Dismantling and Refixing of LT pin insulator
Fixing of shackle
Dismantling and Refixing of LT shackle
Fixing of LT three phase cross arm
Dismantling and Refixing of three phase cross arm
Fixing of LT single phase cross arm
Dismantling and Reerection of 11 KV lines ACSR 7 / 4.09 conductor.
Stringing of 11 KV lines of 7/3.35 mm conductors .
Stringing of LT lines of 7/2.59 mm conductors .
Dismantling and Stringing of LT lines of 7/2.59 mm conductors .
Changing of pinpoint to cutpoint
Excavation of of stay pit on normal ground
Erection of stay set
For ordinary tree clearance and Throng bushes & trees.
For cocount tree clearance and Throng bushes & trees.
Erection of double pole Distribution Transformer structure (except painting)
Dismantling of double pole Distribution Transformer structure
Erection of 11KV single pole structure
Loading & unloading of Distribution Transformer below 250 KVA
Erection of 63KVA Distribution Transformer
Erection of additional support for single pole DT including painting
Dismantling of 63KVA Distribution Transformer
Erection of single phase service wire
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
Tendernotice_2.pdf
PDF • 1.36 MB
BOQ_759186.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid