Tender Value
₹25.6 L
EMD Value
₹25,610
Closing Date
26 Sept 2026, 2:00 pm4d left
Superintending Engineer
Superintending Engineer, E.U.D.C.-1, 57, George Town, Prayagraj
Refer to Tender Description
2026_PVVNV_1185083_1
18/SE/EUDC-I-Pra/MM/2026-27
Open Tender
Electrical Works
Lump-sum
180 days
Magh Mela Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Account Number-0012002100504911
₹25,610
12 Sept 2026
12 Sept 2026
28 Sept 2026
12 Sept 2026
26 Sept 2026
12 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Construction of Temporary 11KV line, L.T. line, Installation of Street Light and other Miscellaneous works in Upper Bundh Area (Parade) North of Lal Road West of ganga river including Parking Area, during Magh Mela 2026-27 which includes loading, unloading and carriage of all required materials from Mela Store to Site and dismantling of all materials after completion of mela and Carriage back to Mela Store Prayagraj. (MS Nut & Bolts with washer for all related works will be provided by contractor on rental basis). | |||||
| 1.01 | Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. Long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on Road crossing and ghats and 4 No. latching per span in other area) & earthing of every Fifth poles. | 12 | Ckt. Km. | - | - |
| 1.02 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock for complete Mela period | 10 | Ckt. Km. | - | - |
| 1.03 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock form 01.12.2026 to 30.06.2027 | 2 | Ckt. Km. | - | - |
| 1.04 | Dismantling of L.T. line single phase, 4 wire after completion of Mela period. | 12 | Ckt. Km. | - | - |
| 1.05 | Construction of L.T. line Three phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span on Road crossing, Ghats and 4 nos latching per span in other area) & earthing of every Fifth poles. | 8 | Ckt. Km. | - | - |
| 1.06 | Maintenance of L.T. Line Three phase 6 wire by providing maintenance gang round the clock for complete Mela period | 7 | Ckt. Km. | - | - |
| 1.07 | Maintenance of L.T. Line three phase, 6 wire by providing maintenance gang round the clock form 01.12.2026 to 30.06.2027. | 1 | Ckt. Km. | - | - |
| 1.08 | Dismantling of L.T. line Three phase 6 wire after completion of Mela period. | 8 | Ckt. Km. | - | - |
| 1.09 | Operation and maintenance of Existing Designer street light. | 100 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
T-No-18 Parade LTHTSS.docx
Tender Documents • 0.14 MB
BOQ_2229909.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .