| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹7.2 L+₹1.2 L (19.4%)Rejected-Finance | L2 | Rejected-Finance L2 BIDDER | |
| 3 | L3₹7.4 L+₹1.3 L (22.3%)Rejected-Finance | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹10.7 L
EMD Value
₹21,500
Closing Date
12 Oct 2022, 2:00 pmClosed
EE ICD 3 LALITPUR
OFFICE OF EE ICD 3 LALITPUR
RESTORATION WORK OF SIRSI MINOR FROM HEAD TO TAIL OF CHOUDHARY CHARAN SINGH UPPER RAJGHAT CANAL.
2022_UPIDC_734640_4
2022-23/EE/02
Open Tender
Civil Works - Canal
Item Rate
45 days
LALITPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹21,500
15 Nov 2022
6 Oct 2022
12 Oct 2022
6 Oct 2022
12 Oct 2022
6 Oct 2022
Amount
Jungle clearance by cutting heavy under growth and bushes upto 7.50 cm diameter i/c collection and removal with all cost of labour T&P etc, required for completion of work including all taxes but excluding GST
Excavation in Mar, Kaber, Ranker & Kanker mixed soil in bed with average disposal lead of 30 m & lift up to 1.5 m including making profile, dressing, manual compaction, labour and T&P etc. Required for proper completion of work including all taxes but excluding GST
Excavation of foundation in M.K.R. & kanker mixed soil including lift up to 1.5m and lead up to 30m including filling , watering, ramming of excavated earth into the trenches or up to the space of the foundation trenches or into the plinth and removal and disposal of surplus earth with all cost of labour , T&P etc. required for proper completion of work including all taxes but excluding GST
Laying C.C. 1:3:6 (M-10) in foundation by mechanical mixing, mechanical vibrating , curring with cost of all material , labour and T&P etc. required proper completion of work including all taxes but excluding GST
Laying Cement Concrete 1:2:4 (M-15, A-20 grade ) By Mechanical mixing, Mechanical Vibrating , curing with all cost of material, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
Steel reinforcement for Cement Concrete work i/c cutting, placing ,binding with GI wire i/c its cost , all labour material and T&P etc. required for proper completion of work but excluding GST
Centering and Shuttering for Plain C.C . work i/c all cost of material , Fabrication , erection , labour etc. required for proper completion of work with all taxes but excluding GST .
Supply & fixing of 110 mm diameter PVC pipe of 6 Kgf/cm2 for canal outlets including all cost of material, labour and T&P etc. required, with all taxes but excluding GST.
Supply & fixing of 160 mm diameter PVC pipe of 6 Kgf/cm2 for canal outlets including all cost of material, labour and T&P etc. required, with all taxes but excluding GST.
E/w in M.K.R. & kanker mixed soil in filling with all lead & lift including dressing, making profile, labour and T&P etc. required for proper completion of work including all taxes but excluding GST
Painting and Lettering and chainaging on Pucca Structure with superior quality of Enamel paints i/c cost of all material, labour T&P etc. required for proper completion of work but excluding GST.
All weather painting of pucca strucutre by plastic paint apex 1st quality Nerolac/Berger/Asian or Equivalent including cost of Emulsion Labour , T&P Taxes etc. Required for proper completion of work but excluding GST
CHANDRA SHEKHAR
SANDEEP SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .