| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | -26.11% | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹16,468.11 (4.51%)Admitted-Finance | -22.78% | ₹3.8 L+₹16,468.11 (4.51%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹20,325.51 (5.56%)Admitted-Finance | -22.00% | ₹3.9 L+₹20,325.51 (5.56%) | L3 | Admitted-Finance |
| 4 | L4₹4.2 L+₹50,047.24 (13.7%)Admitted-Finance | -15.99% | ₹4.2 L+₹50,047.24 (13.7%) | L4 | Admitted-Finance |
| 5 | L5₹4.3 L+₹69,532.04 (19.0%)Admitted-Finance | -12.05% | ₹4.3 L+₹69,532.04 (19.0%) | L5 | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹9,880
Closing Date
4 Apr 2026, 6:00 pmClosed
Commissioner
Municipal Council Deeg
Community Hall Repair Work Jatav Basti Sad Mohalla
2026_DLB_547574_5
Enit16Nirman 2025-26
Open Tender
Civil Works
Percentage
15 days
deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
commissioner
₹9,880
Yes
8 Apr 2026
20 Mar 2026
6 Apr 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | CUM | 229.5 | - |
| 2 | Random rubble dry stone Kharanja (soling) under floor | 1 | CUM | 2,270 | ₹2,267.73 |
| 3 | Random rubble dry stone Kharanja (soling) under floor | 1 | CUM | 2,270 | ₹2,267.73 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | CUM | 4,575 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | CUM | 4,575 | ₹4,570.43 |
| 6 | Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 4,860 | - |
| 7 | Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 4,860 | - |
| 8 | Random rubble masonry with hard stone in foundation and plinth : 25.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) | - | CUM | 4,860 | - |
| 9 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Hot rolled deformed bars | - | Kg | 83.5 | - |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 1 | SQM | 236.5 | ₹236.26 |
stage.html
html • 0.03 MB
technical_976265.pdf
techsummary_976265.pdf
finance_976265.pdf
BOQ Comparative Chart
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_976265.xls
BOQ • 0.33 MB
Scan_20260330_163504.pdf
PDF • 0.70 MB
corrigendum.pdf
PDF • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .