| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-AOC | ₹1.0 Cr | 1 | Accepted-AOC workorderissued |
| 2 | Rejected-Technical DOOR NO 5A SOUTH STREET THENNIMALAI NANGUNERI TIRUNELVELI | - | - | Rejected-Technical Sl No 3 and 4 not enclosed |
| 3 | Rejected-Technical | - | - | Rejected-Technical Sl No 2,3,4,5,6,7,8,9,10 and 12 not enclosed |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
7 Nov 2024, 3:00 pmClosed
Executive Officer, Pathamadai Town Panchayat
Pathamadai Town Panchayat
Strengthening of Existing Damaged BT Road and Construction of Retaining Wall at Sivankovil to Perumal Kovil, Perumal Kovil to Pilliyar Kovil and Perumal Kovil to Kalakasthi Kovil Salai, in Pathamadai Town Panchayat.
2024_DTP_497854_1
40/2024- Nabard 2024-2025 - Pathamadai TP
Open Tender
Civil Works - Roads
Works
Pathamadai Town Panchayat
As per norms
3 documents required · 3 mandatory
₹0
₹1.3 L
Yes
3 Jul 2025
30 Oct 2024
7 Nov 2024
30 Oct 2024
7 Nov 2024
30 Oct 2024
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc.,as per
Plain Cement Concrete 1:4:8 Mix (one part cement, four part M-Sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges fo
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as PCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel s
Plain Cement Concrete 1:2:4 Mix (one part cement, two part M-Sand and Four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charge
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Providing and Laying, Spreading and Compacting graded stone aggregates to WET MIX MECADAM Specification in 250mm thick specification including premixing the materials with water at OMC in mechanical mix plant Carriage of mixed materials by tipper to work site laying in uniform layers with pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of materials,labour charges,rentals for machinery,fuel and all other incidental charges etc complete as per clause 406 of MORTH Specification
Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5.
Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of vg 30 bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumapic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumapic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as clause 505 MORTH Rev-5.
Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm, 0.13cum of 9.50-2.36 mm and 0.26cum of 2.36mm and blow with 50.30kgs of VG 30 /VG 40 bitumen including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20–30 tonnes capacity, conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40 mm with mechanical Paver to the specified grades and cross sections and consolidated by 80 - 10 tonne vibratory/ pneumatic roller to the required density etc., including labor for attending to paver site etc., including hire charges and fuel charges for 20 – 30t CMP with bitumen boiler, tipper trucks, paver finisher,/ 9m paver finisher, vibratory/ pneumatic rollers and all other tools and plant required including fule and all other incidental charges etc., complete as per specification using CMP as for clause 507of MORTH Rev-5.
Collection and Spreading of Red gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road side including loading, unloading and stacking the well gravel at road side to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per as per MORTH Specifications.401 and 1015
Road Marking with ht applied thermoplastic compound with reflectorising glassbeads @ 250gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and fee from streaks and holes etc complete as per MORTH specifications
Clearing and Grubbing by Light Jungle removing and disposing of all materials such as bushes, shrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness as rubbish including all other incidental charges etc., complete as per MORTH Specification 111, 112, 201. a) Upkeeping 1st year (50%)
Upkeeping 2nd year (60%)
Upkeeping 3rd year (60%)
Upkeeping 4th year (60%)
Upkeeping 4th year (60%)
Earth Work excavating and deposting on bank with initial lead of 10m & initial lift of 2m in Hard stiff clay, Stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS20A for making up the berms. as per clause 111, 112, 201, 202, 301 to 305 & 900 of MORTH Vth Revision [Twice in a year] a) Upkeeping for 1st year (40%)
Upkeeping for 2nd year (40%)
Upkeeping for 3rd year (40%)
Upkeeping for 4th year (40%)
Upkeeping for 5th year (40%)
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg/sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per clause 503 a) 4 th year 3%
5 th year 5%
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 kgs of 60/70 Grade Bulk bitumen cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 a)4 th year 3%
5 th year 5%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .