Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -27.77% | ₹1.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 LAdmitted-Finance | -6.01% | ₹1.4 L | L2 | Admitted-Finance |
| 3 | L3₹1.5 LAdmitted-Finance | +2.30% | ₹1.5 L | L3 | Admitted-Finance |
| 4 | L4₹1.5 LAdmitted-Finance | +3.38% | ₹1.5 L | L4 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹2,910
Closing Date
24 Aug 2026, 6:00 pmClosed
XEN REW JAMMU
XEN REW JAMMU
Construction of drain from house of Kishore Kumar to shop of Arun Kumar at ward no 1 Pyt Amb Block Bhalwal AC Nagrota (Block Level)
2026_RDPR_320769_2
e-NIT No. 444 REWJ of 2026-27 dated 12-08-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹2,910
27 Aug 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
24 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: | 23 | cum | 479.3 | ₹11,023.9 |
| 2 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) | 3.8 | cum | 4,826.5 | ₹18,340.7 |
| 3 | Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 40mm nominal size) | 12.39 | cum | 5,733.6 | ₹71,039.3 |
| 4 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 19 | cum | 346.7 | ₹6,587.3 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with | 0.26 | cum | 9,821.85 | ₹2,553.68 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 15 | kg | 123.2 | ₹1,848 |
| 7 | Providing and fixing on wall face un-plasticized Rigid PVC rain water
pipes conforming to IS: 13592 Type A including jointing with seal ring
conforming to IS: 5382 leaving 10 mm gap for thermal expansion. | 10 | m | 366.3 | ₹3,663 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete. | 65 | sqm | 286.35 | ₹18,612.75 |
| 9 | Suspended floors, roofs, landings, balconies and access platforms. | 2 | sqm | 718.2 | ₹1,436.4 |
| 10 | Carriage of sand and Agg 10 Km by MT | 22 | cum | 344.49 | ₹7,578.78 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1067602.xls
BOQ • 0.25 MB
corrigendum.pdf
PDF • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].