Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.1 L+₹10,200 (10.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.2 L+₹16,950 (16.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.4 L+₹34,950 (34.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹7,500
Closing Date
29 Apr 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF WASHROOMS NEAR IMAMBAR SUBHANABAD PYMUS
2026_RDPR_308331_7
NIT_002_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
SOIBUGH
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹7,500
4 May 2026
21 Apr 2026
30 Apr 2026
21 Apr 2026
29 Apr 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 Sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed in soft soil. | - | Cum | - | - |
| 2 | P/l of stone soling hand packed on level in foundation trenches including all carriages of materials | - | Cum | - | - |
| 3 | P/L in position cement concrete of specified grade excl. the cost of centering and shuttering: 1:4:8 (1 cement 4: coarse sand 8 graded stone crushed agg.40mm nominal size). Incl all carraiges of material involved. | - | Cum | 1 | - |
| 4 | Reinforcement for RCC works incld. straightening bending cutting placing in position and binding all complete (TMT Bars) | - | Qtl | - | - |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 150, landings, balconies, shelnes, chajjas, lintels, bands, plain window sills, stair cases and spiral stair cases upto floor V level excluding cost of centering, shuttering, finishing and reinforcement with (M-20 Mix) 1:2:4 (1 Cement: 2 Coarse Sand: 4 graded stone aggregate 20mm nominal size- crushed.) Incl all carraiges of material involved. | 1 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size) | - | Cum | - | - |
| 7 | Brick work with FPS bricks of class designation 75 in foundation and plinth in cement mortar in 1:6 mix incl carraige of bricks upto site of work complete including extra upto floor v level including carraige and head load | 1 | Cum | - | - |
| 8 | Providing and laying of cement concrete rings 3' wide in soakage pit includind excavation and a cover slab all complete job | - | No | - | - |
| 9 | Providing and fixing steel work in frames of doors windows clestory windows wrought frame and fixed in position including cost of primer coat | 1 | Sqm | 1 | ₹1 |
| 10 | Centring and shuttering including strutting proping and removal of form work for foundations, footings, bases of columns slabs etc for mass concrete. | - | Sqm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_999346.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .