Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BHAGWATI NAGAR JAMMU | Admitted-Finance |
| 2 | Admitted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | Admitted-Finance |
| 3 | Admitted-Finance BHAGWATI NAGAR JAMMU | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,820
Closing Date
11 Nov 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
MH MORH
Repair of 180 HP slipring motor unit no. 1 installed at pumping station Salmay stage-2nd (old) and repair of 250 KVA voltage stabilizer at pumping station Channi Mansar stage-2nd
2022_PHE_194213_1
ENIT NO. 167 OF 2022-23
Open Tender
Repair and Maintenance Works
Item Rate
12 days
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
Repair of 180 HP slipring motor unit no. 1 installed at pumping station Salmay stage-2nd (old) and repair of 250 KVA voltage stabilizer at pumping station Channi Mansar stage-2nd
7 documents required · 7 mandatory
₹200
XEN JAL SHAKTI PHE MECHANICAL DIVISION UDHAMPUR
₹2,820
21 Nov 2022
31 Oct 2022
12 Nov 2022
31 Oct 2022
11 Nov 2022
31 Oct 2022
Amount
Repair of 180 HP slipring motor unit no. 1 installed at pumping station Salmay stage-2nd (Old) by way of disconnecting the electrical connection, decoupling from pump, unfastening from base frame, shifting to a safer place in the pump room, dismantling the slipring assembly, opening the end covers, extraction of rotor and subsequently shifting to workshop. Cutting the external bands and dismantling the rotor and removing / extracting damaged / burnt copper strips by way of gas / mechanical cutting, cleaning the rotor slots with organic solvent, and subsequently providing and fitting of new copper strips conforming to dimensions of rotor slots, complete with superior insulation material alongwith fixing of copper loops and completely brazing the rotor. The job further includes insulating each end of copper strips with the glass tape and varnishing of rotor with quality varnish by dipping and baking it in electric oven so that the strips are firmly secured in the slots and damage because of vibration due to electric resonance is avoided. Job also covers replacement of copper connection cables-3nos with thimbling and insulation. Job covers welding, turning and finishing to bearing size of rotor shaft alongwith replacement of old wornout bearing 6413-01no. with a new one. Shifting the rotor back to site, cleaning the stator with organic solvent to remove dust particle and other foreign material etc., fitment of rotor, closing the end covers, replacement of damaged slipring assembly, bracket-3nos. and carbon bushes-6nos. Installation of motor on the base frame, coupling with the pumping unit and testing of complete unit on no and full load conditions. Complete job includes cost of material, manual carriage charges, skilled labour charges, hire charges of tools and tackles, etc. Rebate, if any, should be quoted separately.
Repair of 250 KVA voltage stabilizer installed at pumping station Channi Mansar stage-2nd by way of by way of isolating from incoming 11 KV power, disconnecting all electrical connections and making temporary arrangement for running of pumping machinery. Dragging the stabilizer outside the pump room by deploying manual labour and with the help of tools tackles. Making of temporary arrangement so as to protect the stabilizer from rain / water during the repair work. Unfastening of nuts, bolts and opening the top cover and then extraction of complete internal assembly by way of chain pulley block. Replacement of 01 no. rotary switch as per sample with a new one and connecting it with phase coil alongwith replacement of connection lead/ strip / plate. Providing and filling of 200 liters transformer oil in the voltage stabilizer. Lowering the internal assembly inside the chamber and closing the top cover. Making all incoming and outgoing electrical connections. Testing the stabilizer on no load at least for 6 hours and then on full load. Complete job includes cost of material, labour charges, hire charges of tools and tackles etc. (complete Job).
PERFECT ELECTRICAL WORKS
NATIONAL ELECTRO-MECH COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .