Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BALUMATH LATEHAR | LATEHAR | JHARKHAND | 822111 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 00 BALIHAWAN DEH MAFI BALIHAWAN DEH MAFI KAUSHAMBI KAUSHAMBI UTTAR PRADESH 212202 | KAUSHAMBI | UTTAR PRADESH | 212202 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹37.7 L
EMD Value
₹75,442
Closing Date
16 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
EXECUTIVE ENGINEER, M.I. DIVISION, HAZARIBAG
Construction of Check Dam on Ambaghat Nala Block- Barhi, District- Hazaribag
2026_WRD_113662_1
WRD/MID/HAZARIBAG/F2 - 02/2026 - 27
Open Tender
Civil Works
Percentage
180 days
BARHI, HAZARIBAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹75,442
18 May 2026
8 May 2026
18 May 2026
8 May 2026
16 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance in borrow area, building premises, flanks and slopes on the roads, canals and embankment by removing the grass and the jungle bushes from the top including weeding out shrubs including roots and levelling etc. complete as per direction of E/I. (6.1.3.1 PART B ,PART A-2.02) | 0.1 | Ha | 19,760.3 | ₹1,976.03 |
| 2 | Earth work in excavation of foundation trenches in ordinary soil (Vide classification of soil item-A) and disposal of excavated earth so obtained (50M. away from the edge of the trenches) with initial lead of 150M and initial lift of 1.5M as per specification and dir- ection of E/I..( 6.1.8 PART B) | 2,016.22 | M3 | 177.76 | ₹3,58,403.27 |
| 3 | Earth work in excavation of foundation trenches as per design section in ordinary or soft rock where blasting is not needed (Vide classification of soil item-C) and disposal of excavated materials so obtained (50M. away from the edge of the trenches) with initial lead of 150M and initial lift of 1.5m as per specification and direction of E/I. (6.1.11.2 PART B) | 84.06 | M3 | 570.29 | ₹47,938.58 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to Plinth Level 1:2:4 (1 cement : 2 coarse sand (zone -III) : 4 graded stone aggregate 20 mm nominal size )( B.C.D- 5.3.1.2) | 177.86 | M3 | 4,598.23 | ₹8,17,841.19 |
| 5 | Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with aproved quality of coarse sand of requisite F.M. (2.5 to 3.0) washed and screened with raking out joints, curing, soaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specification and direction of E.I. (6.4 8 PART-B , PART-A 4.28) | 117.07 | M3 | 2,739.68 | ₹3,20,734.34 |
| 6 | Providing rough dressed random rubble stone masonry in cement mortar (1:4) in superstructure with aproved quality of coarse sand of requisite F.M. (2.5 to 3.0) washed and screened with raking out joints, curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specification and direction of E.I. (6.4.14 PART -B, PART-A 4.31) | 169.64 | M3 | 2,906.96 | ₹4,93,136.69 |
| 7 | Providing and laying in position specified grade of reinfored cement concrete,excluding the cost of centering ,shuttering ,finishing,and reinforcement all work up to plinth level 1:1.5:3 (1 cement :1.5 coarse sand (zone-III) :3 graded stone aggregate 20 mm niminal size ). (5.3.9.1 BCD ) | 34.84 | M3 | 5,218 | ₹1,81,795.12 |
| 8 | Providing 25mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. (Common- 3.12 ) | 138.56 | M2 | 258.87 | ₹35,869.03 |
| 9 | Providing shuttering including strutting, proping etc.and its removal after use in foundation work as per specifications and direction of E/I (6.3.20 PART -B) | 216.78 | M2 | 418.03 | ₹90,620.54 |
| 10 | Providing tor steel reinforcement of 8 mm. dia rods per approved design and drawing with cutting, bending and binding with annealed wire cost of wire removal of rust, placing the rods in position (including carriage of bars to work site ) all complete job as per building specification and directions of E/l. TMT Fe 500(Only valid for Tata (tiscon),SAIL,JSPL,Electrosteel Steels Ltd. Bokaro And Vizag (RINL)).( BCD 5.5.4) | - | MT | 83,314.02 | - |
stage.html
html • 0.02 MB
finance_153572.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TENDER_DOCUMENTS_02.pdf
Tender Documents • 15.02 MB
BOQ_153572.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .