Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance NORTH AMMAPATTINAM MANAMELKUDI TALUK PUDUKKOTTAI DT 614 620 | NORTH AMMAPATTINAM | PUDUKKOTTAI | TAMIL NADU | 614620 | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 LAdmitted-Finance | ₹5.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Muhamathu Rafeek L2 | INSOR MOHIDEEN PICHAI L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall (59m) at Vadakkammapattinam PUMS School (Muslim) in Manamelkudi Panchayat | |||||
| 2.00 | Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete | 25.15 | Cum | 263.78 ₹6,634.07 | 263 ₹6,614.45 |
| 3.00 | Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete | 3.28 | Cum | 2,343.17 ₹7,685.60 | 2,343 ₹7,685.04 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete | 4.13 | Cum | 6,152.14 ₹25,408.34 | 6,152 ₹25,407.76 |
| 5.00 | Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete | 75.97 | Sqm | 1,095 ₹83,187.15 | 1,093 ₹83,035.21 |
| 6.00 | Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete | 0.93 | Mt | 91,873.22 ₹84,982.73 | 91,873 ₹84,982.53 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete | 11.55 | Cum | 9,766.93 ₹1.1 L | 9,766 ₹1.1 L |
| 8.00 | Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete for basement. | 11.21 | Cum | 6,273.27 ₹70,323.36 | 6,273 ₹70,320.33 |
| 9.00 | Plastering with Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials and all labour charges etc,. complete. | 196.38 | Sqm | 290.97 ₹57,140.69 | 290 ₹56,950.20 |
| 10.00 | Emulsion Painting two Coats including cost and conveyance of all materials to site and all labour charges etc complete | 196.38 | Sqm | 262.48 ₹51,545.82 | 262 ₹51,451.56 |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
10 Feb 2026, 4:00 pmClosed
BDO (B.PT)
PT UNION OFFICE MANAMELKUDI
Construction of Compound wall (59m) at Vadakkammapattinam PUMS School (Muslim) in Manamelkudi Panchayat
2026_RDTN_650869_1
MLACDS- 2025-26 WORK -01 in MANAMELKUDI PANCHAYATH at MANAMELKUDI BLOCK
Open Tender
Civil Works
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
Yes
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
Construction of Compound wall (59m) at Vadakkammapattinam PUMS School (Muslim) in Manamelkudi Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete
Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete
Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Brick work in cm 1:5 mix using country bricks including cost and conveyance of all materials to site including labour charges incidental charges and curing etc., complete for basement.
Plastering with Cement Mortar 1:5 mix 12mm thick including cost and conveyance of all materials and all labour charges etc,. complete.
Emulsion Painting two Coats including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_780434.xls
BOQ • 0.24 MB
PRE_QUAL.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid