Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹62.9 L
EMD Value
₹1.3 L
Closing Date
15 Oct 2026, 4:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Construction of concrete channel, plantation works and maintenance work at Karim Bagh B 5000nos, plantation and maintenance work at Karim Bagh A L1000nos of Leh Forest Range for the year 2026-27 under CAMPA Scheme 52b river side.
2026_FEE_19687_10
E-Tender No 13 of FDL 2026-27
Open Tender
Civil Works - Others
Item Rate
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Divisional Forest Officer, Leh
₹1.3 L
8 Oct 2026
8 Oct 2026
16 Oct 2026
8 Oct 2026
15 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m, including geeting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50metres all kind of soil. | 195.79 | cum | 1.25 | ₹244.74 |
| 1.02 | Ordinary Rock | 83.91 | cum | - | - |
| 1.03 | Dumping stone including cost of stones in horizontal on level | 139.85 | cum | 100 | ₹13,985 |
| 1.04 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1cement:4coarse sand:8graded stone aggregate 40mm nominal size) | 419.54 | cum | 53 | ₹22,235.62 |
| 1.05 | Centering and shuttering including strutting,propping etc removal of form for foudation, footings base of columns etc for mass concrete. | 1,856.39 | sqm | 10 | ₹18,563.9 |
| 1.06 | Carriage of material by MT from source to site of work, incl. loading,unloading complete job. Cement&steel | 71.32 | MT | 11 | ₹784.52 |
| 1.07 | Carriage of material by MT from source to site of work, incl. loading,unloading complete job. Sand | 197.18 | cum | 12 | ₹2,366.16 |
| 1.08 | Carriage of material by MT from sources to site of work stone agg. | 373.39 | cum | 13 | ₹4,854.07 |
| 1.09 | stone | 139.85 | cum | 14 | ₹1,957.9 |
| 1.1 | cost purchase and pits and planting of willow green cuttings in pits size, 0.45x0.45x0.45 | 6,000 | Nos | 15 | ₹90,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_46510.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .