| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC | ₹28.9 L | L1 | Accepted-AOC LOWEST BID |
| 2 | L2₹33.3 L+₹4.4 L (15.3%)Rejected-Finance SECUNDERABAD | WARANGAL | TELANGANA | 506350 | ₹33.3 L+₹4.4 L (15.3%) | L2 | Rejected-Finance NOT BEING L1 BID |
| 3 | L3₹37.6 L+₹8.7 L (30.0%)Rejected-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹37.6 L+₹8.7 L (30.0%) | L3 | Rejected-Finance NOT BEING L1 BID |
| 4 | L4₹37.8 L+₹8.9 L (30.9%)Rejected-Finance | ₹37.8 L+₹8.9 L (30.9%) | L4 | Rejected-Finance NOT BEING L1 BID |
| 5 | L5₹38.4 L+₹9.5 L (32.8%)Rejected-Finance D NO 3 9 560 P 17 E ROAD NO 4 SRI BALAJI NAGAR MANSOORABAD HYDERABAD 500068 | HYDERABAD | MEDCHAL MALKAJGIRI | TELANGANA | 500068 | ₹38.4 L+₹9.5 L (32.8%) | L5 | Rejected-Finance NOT BEING L1 BID |
| Sl No | Description | Qty | Unit | M/S AMRIT DAS MAHAPATRA L6 | K CHANDRAPAL REDDY L4 | SAI RUPA CONSTRUCTIONS L2 | J.V.V.K.PRABHAKARARAO L5 | omsai thermax engineers L3 | Squad 7 Projects and Services Pvt Ltd L8 | LEOENTERPRISES L7 | SREE LAKSHMI NARASIMHA ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for Excavation in trenches not exc 1.50m wide and not exc 1.50m depth for foundation for manholes etc not exc 10sqm on plan and not exc 1.50m in depth and getting out in hard/ dense soil all as specified and directed by Engr-in-charge. | 500 | Cum | 263 ₹1,31,500 | 270 ₹1,35,000 | 360 ₹1,80,000 | 500 ₹2,50,000 | 396 ₹1,98,000 | 225 ₹1,12,500 | 250 ₹1,25,000 | 180 ₹90,000 Lowest |
| 2.00 | All as in Item No 1.00 above but for depth exc 1.5 m and n exc 3 m depth. | 40 | Cum | 270 ₹10,800 | 270 ₹10,800 | 405 ₹16,200 | 680 ₹27,200 | 297 ₹11,880 | 330 ₹13,200 | 275 ₹11,000 | 190 ₹7,600 Lowest |
| 3.00 | M&L for Excavating over areas not exc 1.5 m deep and getting out in soft/loose soils all as specified and directed by Engr-in-charge. | 70 | Cum | 263 ₹18,410 | 270 ₹18,900 | 360 ₹25,200 | 590 ₹41,300 | 297 ₹20,790 | 195 ₹13,650 Lowest | 325 ₹22,750 | 210 ₹14,700 |
| 4.00 | All as in Item No 3.00 above but for additional 1.50 m or part thereof for depth beyond first 1.5 m (for 3.50 M) all as specified and directed by Engr-in-Charge. | 50 | Cum | 280 ₹14,000 | 333 ₹16,650 | 405 ₹20,250 | 680 ₹34,000 | 414 ₹20,700 | 370 ₹18,500 | 475 ₹23,750 | 225 ₹11,250 Lowest |
| 5.00 | M&L for Reinforced cement concrete pipes class NP2 laid and jointed complete with collars, dia of pipe 450 mm all as specified and directed by Engr-in-charge. | 20 | RM | 4,500 ₹90,000 | 6,300 ₹1,26,000 | 1,800 ₹36,000 | 1,220 ₹24,400 | 900 ₹18,000 Lowest | 1,785 ₹35,700 | 1,950 ₹39,000 | 1,500 ₹30,000 |
| 6.00 | M&L for Pre cast cement concrete type B1 (1:2:4) using 20 mm graded aggregate as in covers for manholes and open drain covers lab including necessary form work and set in cement motor 1:6 all as specified and directed by Engr-in-charge. | 23 | Cum | 6,400 ₹1,47,200 | 11,700 ₹2,69,100 | 7,200 ₹1,65,600 | 6,800 ₹1,56,400 | 10,800 ₹2,48,400 | 5,500 ₹1,26,500 | 5,000 ₹1,15,000 | 4,850 ₹1,11,550 Lowest |
| 7.00 | Returning filling in including spreading levelling watering and well ramming in layers not exc 25 cm. | 160 | Cum | 45 ₹7,200 Lowest | 90 ₹14,400 | 81 ₹12,960 | 140 ₹22,400 | 126 ₹20,160 | 168 ₹26,880 | 125 ₹20,000 | 65 ₹10,400 |
| 8.00 | Removing excavated materials not exc 50 M away and depositing where directed at a level not exc 1.5 M high. | 500 | Cum | 100 ₹50,000 | 252 ₹1,26,000 | 108 ₹54,000 | 230 ₹1,15,000 | 117 ₹58,500 | 154 ₹77,000 | 150 ₹75,000 | 85 ₹42,500 Lowest |
| 9.00 | M&L Loose filling with aggregate of gauge 80 to 150 mm in recharge well all as specified and directed Engr-in-Charge. | 25 | Cum | 1,000 ₹25,000 Lowest | 2,700 ₹67,500 | 1,260 ₹31,500 | 1,850 ₹46,250 | 1,800 ₹45,000 | 1,050 ₹26,250 | 2,200 ₹55,000 | 1,000 ₹25,000 Lowest |
| 10.00 | M&L for Hard core of gauge exc 63 mm but not exc 100 mm deposited spread and levelled in layers not exc 15 cm levelled watered and rammed to a true surfaceall as specified and directed by Engr-in-charge. | 35 | Cum | 1,000 ₹35,000 Lowest | 2,700 ₹94,500 | 1,560 ₹54,600 | 2,030 ₹71,050 | 3,060 ₹1,07,100 | 1,100 ₹38,500 | 2,600 ₹91,000 | 1,175 ₹41,125 |
Tender Value
₹43.0 L
EMD Value
₹86,080
Closing Date
6 Sept 2025, 6:00 pmClosed
GE (UTILITY) SECUNDERABAD
GE UTILITY SECUNDERABAD MUDFORT SECUNDERABAD-500003
PROVN OF RAIN WATER HARVESTING AT LOCATION OF 2 MW SOLAR POWER PLANT AT AOC CENTRE UNDER GE (U) SECUNDERABAD
2025_MES_725408_1
GE (U)/SEC/TOKEN/33 OF 2025-26
Open Tender
Civil Works
Item Rate
180 days
SECUNDERABAD
AS PER NIT
8 documents required · 8 mandatory
₹500
Yes
₹86,080
Yes
7 Nov 2025
9 Aug 2025
13 Sept 2025
9 Aug 2025
6 Sept 2025
23 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .